My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5A Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:09 AM
Creation date
3/14/2018 11:25:02 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-020
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 2. About Eden Housing Application | Parrott Street Apartments <br />September 2017 <br /> 11 <br />Las Palmas <br />15370 Tropic Court, San Leandro | Affordable Family Housing <br /> <br /> <br />Originally constructed in 1962, Las Palmas was acquired by Eden <br />Housing in 2010 as Citizens Housing was winding down their operations. <br />In order to address the capital needs of this project, Eden developed a <br />scope of work that would ensure that the property continues to perform <br />as high‐quality affordable housing in the coming decades. The scope of <br />rehabilitation included reinforcing the building, upgrading the aging <br />building systems, and installing measures to reduce energy and water <br />usage. <br /> <br />As part of the rehabilitation, a solar photovoltaic system was added to <br />the roof that offsets 75% of the common area electricity use. The HVAC, <br />mechanical, plumbing, and electrical systems were upgraded to increase <br />efficiency and to ensure their smooth operation for the decades to come. <br />Common area improvements and unit interior improvements were also <br />undertaken, including replacing light fixtures and exhaust fans with <br />more energy efficient models, and replacing unit appliances with Energy <br />Star models. Materials used during the repair and renewal of the <br />property were selected based on their environmental footprint and <br />extended expected useful life. <br /> <br /> <br /> <br />YEAR ACQUIRED: <br />2010 <br /> <br />YEAR REHAB COMPLETED: <br />2017 <br /> <br />TOTAL REHAB COST: <br />$18,000,000 <br /> <br />UNITS: <br />91 <br /> <br />TARGETED INCOMES: <br />30-60% of AMI <br /> <br />DEVELOPER: <br />Eden Housing, Inc. <br /> <br />ARCHITECT: <br />Weir/Anderson & Associates <br /> <br />CONTRACTOR: <br />Deacon Corp. <br />60
The URL can be used to link to this page
Your browser does not support the video tag.