My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2018-031
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2018
>
Reso 2018-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:54:21 AM
Creation date
4/20/2018 4:29:29 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/16/2018
Retention
PERM
Document Relationships
_CC Agenda 2018 0416 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2018\Packet 2018 0416
8C Consent Calendar 2018 0416
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2018\Packet 2018 0416
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Preliminary Grading Plan <br />• Building Floor Plans <br />• Building Exterior Elevations <br />• Preliminary Structural Drawings <br />• Preliminary Mechanical Drawings <br />• Preliminary Electrical Drawings <br />• Landscape Plan and Irrigation System Description <br />• Draft Technical Specifications <br />• Updated Project Schedule <br />• Updated Construction Cost Estimate <br />Construction Documents Phase (100% PS&E) <br />Based on approved Design Development documents, detailed drawings and specifications will be <br />developed which are suitable for construction. <br />Deliverables <br />This phase will result in complete Construction Plans, Technical Specifications and Estimates for <br />all on-site development that is a part of this project, including: <br />• Architectural Drawings <br />• Aquatics Drawings <br />• Structural Drawings <br />• Mechanical Drawings <br />• Electrical Drawings <br />• Civil Engineering Drawings <br />• Landscape Drawings <br />• Technical Specifications <br />• Structural and Energy Calculations <br />• Updated Project Schedule <br />• Final Cost Estimate <br />• Submittal to Building Department <br />• Plan Check Correction, as required <br />Bid Document Phase <br />Consultant shall incorporate and/or respond to City review comments on the 100% PS&E <br />deliverables. <br />Deliverables <br />This phase will result in final signed bid documents suitable for public bidding to the lowest <br />bidder. <br />Bid Phase <br />Consultant will provide assistance with identifying prospective bidders, clarifying bidder <br />questions and issuing addenda as required. Consultant shall attend two pre-bid conferences. <br />Construction Administration <br />Consultant will perform regular site visits to observe construction (assumes a ten month <br />construction period with site visits twice each month); prepare field observation reports; respond <br />Consulting Services Agreement between City of San Leandro and Last revised 2/21/18 <br />Glass Architects for the Farrelly Pool Replacement Exhibit A — Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.