Laserfiche WebLink
• Preliminary Grading Plan <br />• Building Floor Plans <br />• Building Exterior Elevations <br />• Preliminary Structural Drawings <br />• Preliminary Mechanical Drawings <br />• Preliminary Electrical Drawings <br />• Landscape Plan and Irrigation System Description <br />• Draft Technical Specifications <br />• Updated Project Schedule <br />• Updated Construction Cost Estimate <br />Construction Documents Phase (100% PS&E) <br />Based on approved Design Development documents, detailed drawings and specifications will be <br />developed which are suitable for construction. <br />Deliverables <br />This phase will result in complete Construction Plans, Technical Specifications and Estimates for <br />all on-site development that is a part of this project, including: <br />• Architectural Drawings <br />• Aquatics Drawings <br />• Structural Drawings <br />• Mechanical Drawings <br />• Electrical Drawings <br />• Civil Engineering Drawings <br />• Landscape Drawings <br />• Technical Specifications <br />• Structural and Energy Calculations <br />• Updated Project Schedule <br />• Final Cost Estimate <br />• Submittal to Building Department <br />• Plan Check Correction, as required <br />Bid Document Phase <br />Consultant shall incorporate and/or respond to City review comments on the 100% PS&E <br />deliverables. <br />Deliverables <br />This phase will result in final signed bid documents suitable for public bidding to the lowest <br />bidder. <br />Bid Phase <br />Consultant will provide assistance with identifying prospective bidders, clarifying bidder <br />questions and issuing addenda as required. Consultant shall attend two pre-bid conferences. <br />Construction Administration <br />Consultant will perform regular site visits to observe construction (assumes a ten month <br />construction period with site visits twice each month); prepare field observation reports; respond <br />Consulting Services Agreement between City of San Leandro and Last revised 2/21/18 <br />Glass Architects for the Farrelly Pool Replacement Exhibit A — Page 3 of 4 <br />