My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Implement phase 2 of the Downtown Parking Strategy generally consisting of a Smart Parking System and pay <br />stations. <br />Description <br />Implement phase 2 of the Downtown Parking Strategy generally consisting of a Smart Parking System and pay <br />stations. See project 2016.0460 for phase one implementation. This project will be needed when the occupancy rate <br />of our parking spots reaches 85%, at which time we will want to begin charging for on street parking. A smart parking <br />system includes sensors in each parking space that can be accessed via the internet and used to locate available <br />parking spots. Work includes installation of new credit card/mobile payment enabled meters, parking sensors, <br />streetlight monitoring and Wi-Fi network system in the downtown periphery area which is roughly bounded by San <br />Leandro Blvd, Williams St, Santa Maria St, and San Leandro Creek. <br />Justification or Benefit of Project <br />Real-time parking information, reduced searching for parking, emissions and traffic congestion, optimized parking <br />availability to improve the quality of life in a sustainable manner <br />Consequences of not doing the Project <br />Increase congestion and emissions <br />Project Numb 2016.0350Project Typ Parking lots/structures (detac <br />Detailed Cost $2,460,000 Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost Increase <br />Likely Cost <br />Categor Buildings <br />Project Name Downtown Smart Parking System <br />112
The URL can be used to link to this page
Your browser does not support the video tag.