Laserfiche WebLink
Summary <br />Upsize existing SS on Dutton Ave from Bancroft to Woodland from 10" to 14" <br />Description <br />Upsize existing SS on Dutton Ave from Bancroft to Woodland from 10" to 14" <br />Justification or Benefit of Project <br />This project is required to safely convey projected sanitary sewer flows. <br />Consequences of not doing the Project <br />Without this project, projected development and rain infiltration may cause a sanitary sewer overflow on this line. <br />Project Numb 2018.4610Project Typ Sanitary Sewers <br />Detailed Cost $600,000 Status Funded CIP <br />Department/Sponsor Public Works <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Neutral <br />Likely Cost <br />Categor WPCP Enterprise <br />Project Name Dutton Ave SS Upsize part 1 <br />119