My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Eliminate the pork chop island for right turn from eastbound Floresta Blvd to southbound Monterey Blvd. <br />Description <br />This project eliminates the pork chop island on the eastbound approach of Floresta Blvd eliminating the separated <br />right turn improving the crossing for pedestrians and providing for a crosswalk along the west leg of Floresta Blvd. <br />New sidewalk along the new alignment is to be installed. <br />Justification or Benefit of Project <br />This project improves pedestrian safety at this intersection and makes the crossing pedestrian friendly. <br />Consequences of not doing the Project <br />Reduction in safety, no increase in the number of pedestrians <br />Project Numb 2016.0520Project Typ Traffic and Pedestrian - Contr <br />Detailed Cost $250,000 Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Increase Impact to Maintenance Cost Increase <br />Likely Cost <br />Categor Bicycle and Pedestrian <br />Project Name Floresta Monterey Pedestrian Imp <br />152
The URL can be used to link to this page
Your browser does not support the video tag.