My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Construct improvements to Marina Blvd between Merced and Doolittle based upon the Marina Blvd. Streetscape <br />Improvements Conceptual Design. <br />Description <br />Streetscape Improvements to Marina Blvd between Merced Street and Doolittle Drive to enhance this main <br />thoroughfare through the City and build upon the major investments and improvements to the Marina Blvd I-880 <br />overpass, Marina/Merced intersection and Merced streetscape improvements. Improvements are envisioned to <br />generally consist of the following: Resurfacing of the street Construction of medians and or planters in the parking <br />lane Construction of sidewalk bulb outs at pedestrian crossing locations Installation of landscaping and decorative <br />elements or art Project to include obtaining and using recycled water for irrigation. Undergrounding of existing <br />utilities is highly desirable and is listed under a separate project, Project 2018.5800. <br />Justification or Benefit of Project <br />This project will create an attractive gateway to the Shoreline from I-880 and support the successful transition of the <br />City’s industrial area to a Next Generation Workplace District which will attract additional investment and build upon <br />Kaiser’s $1 billion investment. <br />Consequences of not doing the Project <br />The City may not be able to attract higher uses and additional investment in its industrial area. Additionally, the <br />Shoreline project may suffer as the current roadway is unattractive and uninviting. <br />Project Numb 2012.0132Project Typ Roadway streetscape <br />Detailed Cost Status Active <br />Department/Sponsor Community Development <br />Impact to Operation Cost Impact to Maintenance Cost Increase <br />Likely Cost $3.2M to $6.4M <br />Categor Bicycle and Pedestrian <br />Project Name Marina Blvd Streetscape Merced-Doolittle <br />170
The URL can be used to link to this page
Your browser does not support the video tag.