My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Remove and replace play areas at Marina Park north and south including the water animals on the north end. Look <br />into options to expand the north play area toward the east (Seagull Area) <br />Description <br />Ensure the new play equipment is as resistant to rust as much as possible. Anything that is plastic coated must be <br />galvanized first or stainless steel. Carefully evaluate all parts and warranties before putting out to bid. Consider <br />themes that go along with the water, water animals and boats. New play area should have shade structure over it <br />similar to the 3 new picnic areas. Interlocking rubber mats should be used whenever possible and poured in place <br />should be used when inter locking mats are not feasible. Install more benches on both play areas. Remove the fence <br />around the southern play and replace with something more durable and resistant to rust. North play area will need to <br />have additional pads for benches. Install new water animals on the north end and carefully evaluate the system that <br />turns the water on/off for ease of maintenance and a timer to keep it from being used during off hrs. Note: <br />Description and Project Request updated from 2014 version <br />Justification or Benefit of Project <br />Existing playground equipment is dated and in some cases is showing significant degradation. New equipment will <br />provide children with different/new play opportunities, which meet the most current playground safety guidelines. <br />Consequences of not doing the Project <br />Replacement costs will continue to escalate until such point that replacements can’t be made due to budgetary <br />constraints; Equipment that cannot be repaired/replaced will have to come out of service so citizens are not subject <br />to an unsafe environment <br />Project Numb 2014.0390Project Typ Parks and Open Space <br />Detailed Cost $910,000 Status Retired <br />Department/Sponsor Public Works <br />Impact to Operation Cost Impact to Maintenance Cost <br />Likely Cost <br />Categor <br />Project Name Marina Park Play Areas (North and South) <br />180
The URL can be used to link to this page
Your browser does not support the video tag.