My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Improvements to the South Office building for Police Department use and reconfiguration of the Public Safety <br />Building. <br />Description <br />Design and construct the approved option (option A) from conceptual plans prepared by Indigo Architecture in 2014 <br />generally consisting of the following: A build out of the South office building, excluding the theater space, for use as <br />office space by the Police Department. A reconfiguration of the Public Safety Building to expand the dispatch center. <br />The total project cost is estimated at $7,100,000. $208,000 was appropriated in FY 2015-16 and $2,116,983 was <br />appropriated in FY 2016-17; $4,775,017 in additional appropriations is needed to fully fund this project. <br />Justification or Benefit of Project <br />This project will improve public access to the Police Department, ADA accessibility, reliability of the electrical and <br />HVAC systems, building security, dispatch equipment and operations. <br />Consequences of not doing the Project <br />Without this project deficiencies in public access, ADA access, electrical and HVAC systems, building security, and <br />dispatch equipment will remain. Failure of electrical and HVAC systems is more likely to occur. <br />Project Numb 2014.0482Project Typ Police Buildings and Facilities <br />Detailed Cost $7,100,000 Status Active <br />Department/Sponsor Police <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Increase <br />Likely Cost <br />Categor Buildings <br />Project Name Police Bldg & South Office Expansion <br />202
The URL can be used to link to this page
Your browser does not support the video tag.