My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Appendix 2Project List with Scores by CategoryProject Number Category Project NameFiscal Impact: Net CostEconomic Development ImpactLiability, Risk, Public Health, and SafetyProtection of Existing Facilities and Lifespan Quality of LifePopulation ServedExternal or Internal MandateOne time Funding Leverage2018.0020 Annual Programs/ProjectsADA transition plan 17‐18202013332018.0030Annual Programs/ProjectsBike and Ped Improvements 17‐18 211021202018.0110 Annual Programs/ProjectsBuilding Component Replacement301203002018.0160Annual Programs/ProjectsCity Park Major Maintenance203233002018.0090Annual Programs/ProjectsEngineering Studies 17‐18201111002018.0040 Annual Programs/ProjectsNeighborhood Traffic Calm Program 17‐18202002202018.0120 Annual Programs/ProjectsSan Sewer Collection System Repair 17‐18203302032018.0060 Annual Programs/ProjectsSidewalk Program 17‐18203213202018.0050 Annual Programs/ProjectsStreet Overlay / Rehabilitation 17‐18 200323032018.0070 Annual Programs/ProjectsStreet Sealing 17‐18200323002018.0080Annual Programs/ProjectsTraffic Studies 17‐18211011002018.5440 Bicycle and PedestrianAlvarado Street Pedestrian Lighting 112022002016.0420 Bicycle and PedestrianBike and Ped Improve BART to Bayfair 120021012018.4200 Bicycle and PedestrianDavis St Bike Lanes Orchard to SLB 111021202018.4430 Bicycle and PedestrianDavis St Landscape Rehab SLB to 880320111002006.0080 Bicycle and PedestrianDoolittle Streetscape Davis‐Fairwy Desig011022332018.4460 Bicycle and PedestrianDowling Blvd Streetscape Beverly Warwick101020002018.5400 Bicycle and PedestrianDowntown Pedestrian Lighting 122022202018.4490 Bicycle and PedestrianDowntown Walkway Renovation 220121002018.4220 Bicycle and PedestrianDowntown Wayfinding Signage 210011002018.4420 Bicycle and PedestrianDurant Ave Streetscape E14 to Bancroft102021102018.4440 Bicycle and Pedestrian Durant Ave Streetscape McArth to Bncrft102021102012.0120 Bicycle and Pedestrian E14th Pedestrian Imp 136th‐S City Limit131023202005.0100 Bicycle and Pedestrian E14th St Medians ‐ 145th to S City Limit022023202018.5420 Bicycle and Pedestrian East 14th Pedestrian Lighting North 122022212018.5670 Bicycle and Pedestrian East 14th St Downtown Pedestrian Safety212002102018.4400 Bicycle and Pedestrian East 14th St Triangle Gateway 120033232018.4470 Bicycle and Pedestrian Fairway Dr Streetscape & Reconfiguration 2 2 2 0 3 1 0 02016.0520 Bicycle and Pedestrian Floresta Monterey Pedestrian Imp 102011002004.0170 Bicycle and Pedestrian MacArthur Blvd Streetscape Phase 2 111021202016.0490 Bicycle and Pedestrian Manor Blvd Pedestrian Improvements 1 1 2 2 2 1 2 02018.4410 Bicycle and Pedestrian Marina Blvd Median Rehab East of 880 3 1 0 1 1 1 0 02012.0132 Bicycle and Pedestrian Marina Blvd Streetscape Merced‐Doolittle 0 3 1 0 2 2 2 02012.0131 Bicycle and Pedestrian Marina Blvd Streetscape West of Doolittl 0 3 1 0 2 2 2 02016.0340 Bicycle and Pedestrian Merced St Streetscape Williams to Wicks121021002016.0550 Bicycle and Pedestrian Ped Signal at Davis and Carpentier 1 1 3 0 1 1 0 32018.5610 Bicycle and Pedestrian Pedestrian Crossing Improvements 1 0 2 0 1 1 1 02018.4480 Bicycle and Pedestrian SLB Median Rehab Williams to E14th 3 1 0 1 1 1 0 02018.4450 Bicycle and Pedestrian Victoria Circle Reconfiguration 1 1 0 0 2 1 2 02016.0441 Bicycle and Pedestrian West Industrial Area Ped Lighting Instal122021002016.0440 Bicycle and PedestrianWest Industrial Area Ped Lighting Study122021002018.4800 Bicycle and PedestrianWilliams St Bike and Ped Imp near UPRR212022102018.2440 BuildingsCasa Peralta Renovation Phase 3 210321002003.0930 BuildingsCity Hall Council Chamber ADA Reconfig201011302016.0370 BuildingsCity Hall Fixtures Furnishing Equipment301201002018.1210 BuildingsCity Hall Permit Center Acoustics 200010002018.1240 BuildingsCity Hall Roof Replacement201200002018.1220 BuildingsCivic Center Exterior Paint200110002016.0460 BuildingsDowntown Parking Strategy Implementation 230012032016.0350 BuildingsDowntown Smart Parking System 3200110030
The URL can be used to link to this page
Your browser does not support the video tag.