Laserfiche WebLink
Summary <br />Remove and replace AC pavement and wood decking on existing golf cart bridge over the Estudillo Canal. <br />Description <br />The existing decking has rotted and failed, the bridge is currently closed. This project will remove and replaced the <br />deteriorated portions of the wood decking as well as the entire AC pavement surfacing. <br />Justification or Benefit of Project <br />Without this bridge patrons of the golf course must backtrack and use another bridge located 350 feet to the east. <br />Consequences of not doing the Project <br />If the bridge isn't repaired it will remain closed. <br />Project Numb 2018.3060Project Typ Parks and Open Space <br />Detailed Cost Status Active <br />Department/Sponsor Public Works <br />Impact to Operation Cost Impact to Maintenance Cost <br />Likely Cost $100k to $200k <br />Categor Parks and Open Space <br />Project Name Replace Golf Cart Bridge Deck <br />211