Laserfiche WebLink
Appendix 4 <br />Category Weight <br />Fiscal Impact: Net Cost 10 <br />Economic  Development Impact 10 <br />Liability, Risk, Public Health, and Safety 15 <br />Protection of Existing Facilities and Lifespan 15 <br />Quality of Life 10 <br />Population Served 5 <br />External or Internal Mandate 5 <br />One time Funding Leverage 10 <br />Project List with Weighted Scores <br />Project Number Category Project Name <br />Weighted  <br />Score <br />2018.0020 Annual Programs/Projects ADA transition plan 17‐18 120 <br />2018.0030 Annual Programs/Projects Bike and Ped Improvements 17‐18 80 <br />2018.0110 Annual Programs/Projects Building Component Replacement 90 <br />2018.0160 Annual Programs/Projects City Park Major Maintenance 140 <br />2018.0090 Annual Programs/Projects Engineering Studies 17‐18 65 <br />2018.0040 Annual Programs/Projects Neighborhood Traffic Calm Program 17‐18 70 <br />2018.0120 Annual Programs/Projects San Sewer Collection System Repair 17‐18 150 <br />2018.0060 Annual Programs/Projects Sidewalk Program 17‐18 130 <br />2018.0050 Annual Programs/Projects Street Overlay / Rehabilitation 17‐18 130 <br />2018.0070 Annual Programs/Projects Street Sealing 17‐18 100 <br />2018.0080 Annual Programs/Projects Traffic Studies 17‐18 60 <br />2018.5440 Bicycle and Pedestrian Alvarado Street Pedestrian Lighting 80 <br />2016.0420 Bicycle and Pedestrian Bike and Ped Improve BART to Bayfair 65 <br />2018.4200 Bicycle and Pedestrian Davis St Bike Lanes Orchard to SLB 70 <br />2018.4430 Bicycle and Pedestrian Davis St Landscape Rehab SLB to 880 80 <br />2006.0080 Bicycle and Pedestrian Doolittle Streetscape Davis‐Fairwy Desig 100 <br />2018.4460 Bicycle and Pedestrian Dowling Blvd Streetscape Beverly Warwick 45 <br />2018.5400 Bicycle and Pedestrian Downtown Pedestrian Lighting 100 <br />2018.4490 Bicycle and Pedestrian Downtown Walkway Renovation 80 <br />2018.4220 Bicycle and Pedestrian Downtown Wayfinding Signage 45 <br />2018.4420 Bicycle and Pedestrian Durant Ave Streetscape E14 to Bancroft 70 <br />2018.4440 Bicycle and Pedestrian Durant Ave Streetscape McArth to Bncrft 70 <br />2012.0120 Bicycle and Pedestrian E14th Pedestrian Imp 136th‐S City Limit 100 <br />2005.0100 Bicycle and Pedestrian E14th St Medians ‐ 145th to S City Limit 95 <br />2018.5420 Bicycle and Pedestrian East 14th Pedestrian Lighting North 110 <br />2018.5670 Bicycle and Pedestrian East 14th St Downtown Pedestrian Safety 75 <br />2018.4400 Bicycle and Pedestrian East 14th St Triangle Gateway 115 <br />2018.4470 Bicycle and Pedestrian Fairway Dr Streetscape & Reconfiguration 105 <br />2016.0520 Bicycle and Pedestrian Floresta Monterey Pedestrian Imp 55 <br />2004.0170 Bicycle and Pedestrian MacArthur Blvd Streetscape Phase 270 <br />2016.0490 Bicycle and Pedestrian Manor Blvd Pedestrian Improvements 115 <br />2018.4410 Bicycle and Pedestrian Marina Blvd Median Rehab East of 880 70 <br />2012.0132 Bicycle and Pedestrian Marina Blvd Streetscape Merced‐Doolittle 85 <br />2012.0131 Bicycle and Pedestrian Marina Blvd Streetscape West of Doolittl 85 <br />2016.0340 Bicycle and Pedestrian Merced St Streetscape Williams to Wicks 70 <br />2016.0550 Bicycle and Pedestrian Ped Signal at Davis and Carpentier 110 <br />2018.5610 Bicycle and Pedestrian Pedestrian Crossing Improvements 60 <br />2018.4480 Bicycle and Pedestrian SLB Median Rehab Williams to E14th 70 <br />35