Laserfiche WebLink
Summary <br />This project funds various citywide programs identified in the San Leandro Bicycle and Pedestrian Master Plan. <br />Description <br />This project will fund various programs listed in the City’s Bicycle & Pedestrian Master Plan, including the following: <br />1. Bike-to Work-Day Event • Promote the event to encourage bicycling • Host an Energizer Station at the downtown <br />SL Bart station 2. Bike rack Program • Receive requests for bike racks & parking information • Install bike racks in the <br />ROW at appropriate requested locations 3. Design, and construct upgrades to traffic signals, and safety equipment to <br />meet pedestrian accessibility guidelines 4. Pedestrian & Bicycle Safety Education • Bicycle and Pedestrian Advisory <br />Committee (BPAC) support 5. Bicycle Spot Improvements • Install bike related road signs • Design bikeways and <br />pedestrian paths • Install or modify pavement markings & striping to accommodate bicycle traffic on City streets • <br />Install bicycle detection at traffic signals <br />Justification or Benefit of Project <br />This project constructs pedestrian and bicyclist safety improvements throughout the city to provide our citizens with a <br />city where walking and bicycling are fully integrated into daily life and environmentally-friendly transportation <br />alternatives are available that are both safe and convenient for people of all ages. <br />Consequences of not doing the Project <br />If this project is not completed, new sidewalks, bike lanes, signage and other improvements will not be constructed, <br />impacting the safety of bicyclists and pedestrians. Bicycle racks will not be installed, which are needed to discourage <br />theft and make wall <br />Project Numb 2016.0030Project Typ Traffic and Pedestrian - Contr <br />Detailed Cost $50,000 Status Retired <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost <br />Likely Cost <br />Categor <br />Project Name Annual Bike & Ped Improvements 15-16 <br />57