Laserfiche WebLink
Current status <br />6 year look ahead prepared two years ago <br />FY 2020 FY 2021 FY 2022 FY 2023 <br />•Manor Blvd Pedestrian <br />Improvements <br />•Financial Software System <br />Replacement <br />•Storm Drain Video Inspection 4 of <br />10 <br />•Storm Drain Video Inspection 5 of <br />10 <br />•Washington Manor Park Picnic <br />Area Renovation <br />•Storm Drain Video Inspection 3 of <br />10 •Floresta Monterey Traffic Signal •SLB Broadmoor Traffic Circle <br />•Storm Drain Video Inspection 2 of <br />10 <br />•Main Library Mary Brown Room <br />Remodel <br />•Sanitary Sewer Lift Station <br />Upgrade <br />•Williams St Bike and Ped Imp near <br />UPRR <br />•Traffic Safety Imp at RR crossings <br />•Washington Manor Park Tai Chi <br />Expansion <br />•Doolittle Streetscape Davis to <br />Fairway •Teagarden SS lift Station upgrade <br />•Beverly Ave SS Upsize •East 14th St SS Upsize <br />•Farrelly Drive SS Upsize at <br />Dorchester <br />Note: Annual Projects such as Street Sealing, ADA transition, etc. are not shown16