My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Pave and stripe the Chabot Park parking lot (area just past the bridge). <br />Description <br />This project is a portion of the Chabot Park Master Plan Project, project #2003.0160. Pave and stripe the Chabot <br />Park parking lot (area just past the bridge). Chabot Park is operated by the City of San Leandro on leased property <br />from EBMUD and is located in the city of Oakland. <br />Justification or Benefit of Project <br />The parking lot at this park is unpaved and grading it is an issue. It is simply dirt with some crushed rock on top that <br />is replaced as low spots are created. During the rainy season, the dirt turns to mud, and becomes rutted and <br />unstable. This project was identified in a list of projects needed at Chabot Park and will create a usable parking lot <br />for all seasons. <br />Consequences of not doing the Project <br />The dirt lot is difficult to negotiate during the rainy season. In addition, tripping hazards are created due to the mud <br />and rutting. The maintenance costs associated with replacing the rock will continue. <br />Project Numb 2012.0030Project Typ Parks and Open Space <br />Detailed Cost Status Active <br />Department/Sponsor Public Works <br />Impact to Operation Cost Impact to Maintenance Cost <br />Likely Cost $400k to $800k <br />Categor Parks and Open Space <br />Project Name Chabot Park Parking Lot <br />83
The URL can be used to link to this page
Your browser does not support the video tag.