My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Sinking fund to cover the cost of replacement or renovation of components of City Buildings and their grounds. <br />Description <br />Funding for replacement or renovation of building components that have failed or reached the end of their useful life <br />including elevators, movable partitions, roofing, flooring, mechanical systems (HVAC, plumbing, etc.), paint, parking <br />lots, sidewalks and walkways, landscaping, and irrigation systems. Scope excludes repair and replacement of <br />furniture, computer and AV equipment, and commercial kitchen equipment. Each item of work is generally valued at <br />greater than $100,000, smaller projects are covered under the Building Maintenance line item of the Public Works <br />operating budget. Halcyon Park and Manor Park recreation center buildings are covered by this fund but other <br />buildings in parks are covered by the City Park Major Maintenance fund and are excluded from this fund. Note that <br />the building maintenance line of the Public Works budget includes tasks required to maintain existing systems in <br />operation during their useful life but excludes wholesale replacement of systems when they wear out. <br />The following projects are scheduled for FY18 and 19: City Hall roof replacement, Fire Station 13 parking lot, Garage <br />trim painting, and Civic Center exterior painting. This project is funded annually. <br />Justification or Benefit of Project <br />The City owns and operates approximately 400,000 sf of conditioned building space. Continued funding of this <br />program will ensure that wear items within the buildings and on the building sites are replaced at the end of their <br />useful life. <br />Consequences of not doing the Project <br />Without this project building maintenance items will be listed as individual projects within the capital improvement <br />program. If these individual projects aren't funded then the usefulness of the buildings will decline. If roof <br />replacement is deferred water leaks could cause damage to the interior of the building. <br />Project Numb 2018.0110Project Typ Annual Program/Maintenance <br />Detailed Cost $600,000 Status Active <br />Department/Sponsor Public Works <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Neutral <br />Likely Cost <br />Categor Annual Programs/Projects <br />Project Name City Building Major Maintenance <br />88
The URL can be used to link to this page
Your browser does not support the video tag.