My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Signal and striping modifications at 8 intersections throughout town. <br />Description <br />Signal and striping modifications at 8 intersections throughout town. Restripe vehicle approaches at the following <br />intersections to match lane allocations to volume of vehicles making each turning movement. 1. East 14th St at Davis <br />St 2. Hesperian Blvd at Halcyon Dr/ Fairmont Dr 3. San Leandro Blvd at Marina Blvd 4. Phillips Lane at Davis Street <br />5. Doolittle Drive at Davis Street 6. Doolittle Drive at Marina Blvd 7. Alvarado Street at Fairway/Aladdin 8. Warden/ <br />Timothy at Davis St Modify signals timing and equipment as required. Connect signal controllers to fiber if available. <br />Justification or Benefit of Project <br />This project is listed in the general plan as required to maintain level of service through 2035. <br />Consequences of not doing the Project <br />Without this project the level of service at these intersections will decrease and delay will increase. <br />Project Numb 2018.5630Project Typ Traffic and Pedestrian - Contr <br />Detailed Cost Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Neutral Impact to Maintenance Cost Increase <br />Likely Cost $200k to $400k <br />Categor Roadways for vehicles <br />Project Name Citywide Signalized Intersection Imp <br />97
The URL can be used to link to this page
Your browser does not support the video tag.