Laserfiche WebLink
Environmental Checklist Geology and Soils <br /> Initial Study – Mitigated Negative Declaration 37 <br />there are no open faces located within 500 feet of the site. Therefore, the potential for lateral <br />spreading to affect the site is low. In addition, the project site is generally flat, and would not be <br />subject to offsite landslides. However, the report indicated there is a potential for liquefaction of <br />localized sand layers at the project site during a significant seismic event, which could result in loss, <br />injury, or death to project site personnel. Therefore, impacts are potentially significant without <br />mitigation. Nonetheless, the report concluded that from a geotechnical viewpoint, the project is <br />feasible provided the considerations included in Mitigation Measure GEO-1 below are addressed in <br />the project design. <br />Mitigation Measures <br />The following mitigation measure shall be implemented prior to and during project construction: <br />GEO-1 Geotechnical Considerations. The project applicant shall implement all measures and <br />recommendations set forth in the Geotechnical Study prepared by Cornerstone Earth <br />Group in November 2016. These include but are not limited to: <br /> Foundations designed to tolerate total and differential settlement <br /> Remedial grading must include over-excavation and re-compaction of <br />undocumented fill inside the building footprint <br /> Slabs-on-grade should have sufficient reinforcement and be supported on a layer of <br />non-expansive fill <br /> Footings should extend below the zone of seasonal moisture fluctuation <br /> Limit moisture in surficial soils by using positive drainage away from buildings as well <br />as limiting landscaping watering <br /> Special requirements for corrosion control must be made to protect metal pipes <br />A project geotechnical engineer must be present during construction activities to provide <br />geotechnical observation and testing during earthwork and foundation construction to <br />determine compliance with project plans and mitigation. <br />Pursuant to the 2016 Geotechnical Report for the project (Appendix A), provided the <br />recommendations presented in the report are complied with and implemented during design and <br />construction, construction of the project would not create hazards related to site geology or soils <br />and the effects of liquefaction induced settlement on the proposed structure would be mitigated. <br />Therefore, with implementation of Mitigation Measure GEO-1, the potentially significant impact <br />associated with ground shaking and liquefaction would be reduced to a less than significant level. <br />LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED <br />a.4. Expose people or structures to potential substantial adverse effects, including the risk of loss, <br />injury, or death involving landslides? <br />The project site and surroundings are generally level, and no steep slopes are located near the <br />project. Therefore, there is no potential for landslides at the site. No impact would occur. <br />NO IMPACT <br />334