My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
5A Public Hearings 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:50:39 PM
Creation date
5/2/2018 12:49:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1053
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Environmental Checklist Greenhouse Gas Emissions <br /> Initial Study – Mitigated Negative Declaration 45 <br />Table 6 Project Greenhouse Gas Emissions <br />Emission Source <br />Proposed Project <br />(MT CO2e/year) <br />Existing Land Use <br />(MT CO2e/year)* <br />Operational <br />Area <0.1 (<0.1) <br />Energy 588 (24) <br />Solid Waste 99 (9) <br />Water 14 (14) <br />Mobile <br />CO2 and CH4 790 (84) <br />N2O 35 (4) <br />Total 1,526 (135) <br />Net Increase 1,391 <br />BAAQMD Threshold 1,100 <br />Significant Impact? Yes <br />See Appendix B for CalEEMod worksheets, Table 2.2 “Overall Operational - Unmitigated Operational” <br />( ) denotes subtraction <br />* Estimates for existing onsite uses only take into account the occupied portion of the project site. Therefore, this analysis is <br />conservative. <br />Mitigation Measures <br />Implementation of Mitigation Measure GHG-1 would reduce potential impacts associated with GHG <br />emissions to a less than significant level. <br />GHG-1 GHG Reduction Plan. The project applicant shall reduce operational GHG emissions <br />through implementation of one or both of the following: <br />a. Prior to building permit issuance, develop a project GHG Reduction Plan that <br />reduces annual GHG emissions from the project to below 1,100 MT CO2e per year <br />over the operational life of the project. The plan shall list reduction measures that <br />will be implemented by the project and quantify total operational emissions <br />associated with the project. City staff shall verify the measures are included in site <br />plans and that, with implementation, emissions would be below 1,100 MT CO2e per <br />year. The plan will be implemented onsite by the project applicant and may include, <br />but not be limited to, the following components: <br />1. Charging stations for alternative fuel vehicles <br />2. Energy and water efficient equipment, appliances, heating, and cooling <br />3. Energy efficient lighting <br />4. Water conservation and recycling <br />6. Renewable energy production <br />7. Trip reduction (e.g., employee ridesharing, vanpool/shuttle) <br />8. Carbon sequestration <br />9. Recycling and composting of solid waste <br /> <br />and/or <br />342
The URL can be used to link to this page
Your browser does not support the video tag.