Laserfiche WebLink
DescriptionCurrent FeeReference2018-19 PROPOSED FEES/EXPLANATIONPUBLIC WORKS SERVICES DEPARTMENT – Environmental Services Section 1 Hazardous Materials StorageSLMC 3-3-300Quantity Range 1 $ 119.00 (1) 123.00$ Quantity Range 2 $239.00 247.00$ Quantity Range 3 $345.00356.00$ Quantity Range 4 $451.00465.00$ Quantity Range 5 $563.00581.00$ B. Annual Fees for Storage of Radioactive Materials (1) $166.00 171.00$ C. Aboveground Tank Installation Permit (3) (2)· First Tank$878.00 906.00$ · Each Additional$293.00 302.00$ D. APSA Facility Annual Fee Qualified Facility (Tier I/Tier II)$146.00 151.00$ Non-Qualified Facility (full SPCC)$258.00 266.00$ 2Accidental Release Program Review of RMP by:SLMC 3-3-300 Additional Review by City Staff$146.00/hour151.00$ Additional Review by third party Outside consultantDirect Costs plus 10% Annual Fee: Program 1 $571.00 589.00$ Program 2 $742.00 766.00$ Program 3 $963.00 994.00$ Program 4 $1,445.00 1,491.00$ 3 Underground Hazardous Materials StorageSLMC 3-3-300A. Annual Operating Permit: Each Tank $126.00 130.00$ B. New Tank Installation (2)· First Tank $2,633.00 2,717.00$ · Each Additional $293.00 302.00$ C. Tank Removal, Repair, Alterations (2)· First Tank $1,463.00 1,510.00$ Each Additional $234.00 241.00$ D. Minor Repairs and Alterations Hourly Rate $146.00/hour151.00$ 4Hazardous Waste On-site Treatment: Annual Fees:· Permit-by-Rule $1,088.00 1,123.00$ · Conditional Authorization $464.00 479.00$ · Conditional Exempt $126.00 130.00$ (1)Quantity Range 1 Less than or equal to 500 pounds, 55 gallons, or 2,000 cubic feet at STP.Quantity Range 2 Greater than 500 pounds, 55 gallons, or 2,000 cubic feet at STP, but less than or equal to 5,000 pounds, 550 gallons or 20,000 cubic feet at STP, respectively.Quantity Range 3 Greater than 5,000 pounds, 550 gallons, or 20,000 cubic feet at STP, but less than or equal to 50,000 pounds, 5,500 gallons or 200,000 cubic feet at STP, respectively.Quantity Range 4 Greater than 50,000 pounds, 5,500 gallons, or 200,000 cubic feet at STP, but less than or equal to 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP, respectively.Quantity Range 5 Greater than 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP.(2)Includes plan review, field inspections, and permit processing. Additional time will be charged at the current hourly rate.CA Health & Safety Code; Title 27Change Footnote" "" "" "" "" "Change in Description" "A. Annual fees for storage of combustible liquids, corrosives, flammable gases, flammable liquids, flammable solids, nonflammable gases, organic peroxides, other regulated materials, oxidizers, poisonous gasses, poisonous materials (1)3.2% CPI - rounded to the nearest dollar (All " "" "" "" " " "" "" "" "" "" "" "" "3.2% CPI - rounded to the nearest dollar (All Change in Description3.2% CPI - rounded to the nearest dollar (All 3.2% CPI - rounded to the nearest dollar (All " "" " 211346