Laserfiche WebLink
DescriptionCurrent Fee Refer2018-19 PROPOSED FEES/EXPLANATIONCOMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Divisioniv) Stand-Alone Mechanical PermitUp to $2,000$89$92 $2,001 to $5,000$178$184 $5,001 to $10,000 $178 for the first $5,000 plus $35.60 for each add'l $1,000 or fraction thereof, to and including $10,000$184 for the first $5,000 plus $36.74 for each add'l $1,000 or fraction thereof, to and including $10,000$10,001 and up$356 for the first $10,000 plus $11.87 for each additional $1,000 or fraction thereof over $10,000$367 for the first $10,000 plus $12.25 for each additional $1,000 or fraction thereof over $10,000v) Residential 1 and 2 Family Re-roof a) Main dwelling roof $248 all sizes and materials$256 all sizes and materials b) Detached garages and accessory structures on same property as main dwelling and done at the same time as the main dwelling roof.$79$82 vi) Inspection of the installation of an earthquake gas shutoff valve $32.40 with no Filing & Issuance Fee vii) Residential Seismic Retrofit projects using "Plan set A" (for one and two family residences)$75 plus Filing and Issuance Fee and other miscellaneous fees viii) Photovoltaic Systemsa) Residentiali) Up to 15kW$267$276 ii) each additional kW over 15kW $15 b) Commerciali) Up to 25kW$400 ii) 26kW - 50kW$623$600 iii) each additional kW (51kW - 250kW) $7 iv) each additional kW over 250kW $5 ix) SignsSign permit fees are based on all signs being on the same property and on the same permit.a) 1st Non-energized sign attached to building. $100$103 b) each additional sign thereafter: $50$52 c) Pylon sign, energized or not, each: $211$218 d) Monument sign, energized or not, each $158$163 e) Relocation or alteration of any sign electronically or mechanically, but not including replacement of tubing, transformers and such parts subject to failure; or shop inspection by the local inspection department in lieu of a UL label (a local electrical inspection department label of approval shall be required), each$79$82 x) Demolitiona) Commercial/Residential Demolition up to 3,000SF $267$276 b) Each Additional 10,000SF $178$184 C. Plan Checking FeePlan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to the building permit fee and shall be as follows:i) Plan Check Fee, if applicable 80% of building permit fee ii) For Master Plans (i.e. identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time)A full plan checking fee shall be paid for each Master Plan when more than one building will be built and one-third (33%) of the full plan checking fee shall be paid for each production phase building at time of application. iii) Changes, revisions, or additions to plans previously checked $178 per hour; 1 hour minimum charge$184 per hour; 1 hour minimum chargeiv) Additional plan review after the first re-check $178 per hour; 1 hour minimum charge$184 per hour; 1 hour minimum chargev) Alternate Methods and Materials $178 per hour; 1 hour minimum charge$184 per hour; 1 hour minimum chargevi) Energy Conservation - for all buildings and projects subject to the California Energy Commission’s conservation regulations20% of building permit fee Note: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community Planning Fees, and other mandated fees shall not exceed amounts authorized via Government Code Section 66015. 1329