My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
8D Consent Calendar 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:50:43 PM
Creation date
5/2/2018 12:50:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3.00 <br />Detailed Scope of Work <br /> <br />Jennifer AulettaDarin TerrazasTo:From: <br />Newton Construction & Management, Inc.City of San Leandro - Facilities <br />PO Box 3260 835 14th Street <br />San Luis Obispo, CA 93403 San Leandro, CA 94577 <br />805-544-5583 (510) 577-6022 <br />Work Order Number: <br />February 19, 2018Date Printed: <br />052092.00 <br />San Leandro Marina Community CenterWork Order Title: <br />Brief Scope:City of San Leandro - Marina Community Center Renovation - Budget is $140,000. <br />Work to consist of small kitchen remodel, flooring replacement, drywall repairs and <br />painting. Additional details to follow. Please schedule a Joint Scope Meeting after <br />Labor Day. Coordinate with Jennifer and Gary Sclafini. <br />Revised FinalPreliminaryX <br />The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items <br />set forth below shall be considered part of this scope of work. <br />See Attached Detaile City of San Leandro - Marina Community Center proposed scope of work Scope of Work as follows: <br />Kitchen. 1. Demo – Remove and dispose of existing Dishwasher. Cap water line. 2. FRP - Remove and Replace the <br />existing FRP on two (2) walls (1 wet and 1 dry) Floor to Ceiling, including the removal and replacement of the existing <br />drywall substrate behind the FRP. New FRP to be installed on the existing commercial sink wall and the ice maker/hand <br />wash sink wall. (See attached “Kitchen Floor Plan” drawing) 3. Ceiling - Remove and replace existing suspended Ceiling <br />tiles and Tbar Grid including two (2) grill diffusers. 4. Paint - Paint Two (2) Walls. 5. Interior Doors/Frames - Paint all <br />interior doors and frame (3) both sides. 1 coat prime, 2 coats paint. Approx. 300 sq. ft. 6. Appliances - Remove all existing <br />appliances. Furnish and install new appliances as follows: 1 - 6 Burner Stove, 1 - Stove Griddle, 2 - commercial Stacked <br />ovens and 1 - Ice Maker with new filtration system. 7. Garbage Disposal – Furnish and install one (1) new commercial <br />grade Garbage Disposal on existing stainless steel sink. Utilize power from dishwasher. 8. Floor drain - Replace Floor <br />drain as necessary. 9. Flooring – Furnish and install new Sheet Vinyl with welded seams with cove base. 10. Locker - <br />Provide a movable wardrobe metal locker with one side shelving. Multipurpose Room “C” 1. Flooring – Remove existing <br />VCT flooring and provide a Polished Concrete finish. Furnish and install 6” Rubber Base on walls. 2. Demo - Remove and <br />dispose of all cabinets. 3. Cabinets – Furnish and install Base cabinet(s) commercial grade plywood with a Formica finish <br />and pull handles and lock, with adjustable shelving. Next to sink provide ADA counter top. No Drawers for base cabinet. 4. <br />Cabinet counter top – Furnish and install new Corian with 4” Corian back splash.. 5. Chair Rail - Add along walls with no <br />Cabinetry. Match Room “B”. Paint - Paint all walls, with the exception of the “Skylight Atrium” areas. 6. Interior <br />Doors/Frames - Paint all interior doors and frame (4) both sides and interior storefront with metal frame. 1 coat prime, 2 <br />coats finish paint. 7. Ceiling Lights - Remove and dispose of 30 Ceiling Lights 1X4. Furnish and install 15 new LED 1X4 <br />Lights. Repair Ceiling Tiles as necessary. Multipurpose Room “B” 1. Flooring – Remove existing VCT flooring and provide a <br />Polished Concrete finish. Furnish and install 6” Rubber Base on walls. 2. Demo - Remove and dispose of all cabinets. 3. <br />Cabinets – Furnish and install Base cabinet(s) commercial grade plywood with a Formica finish and pull handles and lock, <br />with adjustable shelving. Next to sink provide ADA counter top. No Drawers for base cabinet. 4. Cabinet counter top – <br />Furnish and install new Corian with 4” Corian back splash. 5. Paint - Paint all walls, with the exception of the “Skylight <br />Atrium” areas. 6. Interior Doors/Frames - Paint all interior doors and frame (4) both sides and interior storefront with metal <br />frame. 1 coat prime, 2 coats finish paint. 7. Ceiling Lights - Remove and dispose of 30 existing Ceiling Lights 1X4. Furnish <br />and install new 15 LED 1X4 Lights. Repair Ceiling Tiles as necessary. d Scope of Work <br />Page 1 of 2 <br />2/19/2018 <br />Scope of Work <br />1407
The URL can be used to link to this page
Your browser does not support the video tag.