My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
8D Consent Calendar 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:50:43 PM
Creation date
5/2/2018 12:50:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
5.00 <br />Contractor's Price Proposal - Detail <br />San Leandro Marina Community Center Cabinet Supplemental <br />052092.01 <br />CA02CO-061416-NCMIQC Master Contract #: <br />Work Order #: <br />Owner PO #: <br />Title: <br />Re: <br />February 05, 2018Date: <br />Proposal Value: <br />Contractor: Newton Construction & Management, Inc. <br />$74,621.52 <br />(Excludes)Equip. MaterialLabor <br />Line TotalDescriptionUOMMod.ItemSect. <br />06 - Wood, Plastic, and Composites <br />06 00 00 00-0001 San Leandro Comm Center1 $59,571.15Ea <br />Installation =x x 59,571.15FactorUnit PriceQuantity TotalNPP 46,500.00 1.2811 1.00 <br />Based on 134 Linear feet of custom cabs plus ADA table. Includes casework and corian counter top with 4' <br />back splash. 3 sink cutouts. <br />06 41 13 00-0017 >18" To 24" Width, 34-1/2" High x 24" Deep Built In Place Base <br />CabinetPrefinished with solid hardwood face frames, hardwood door frames <br />and drawer fronts. Hardwood veneer on raised door panels. Excludes top. <br />2 $13,427.34LF <br />Installation =x x 13,427.34FactorUnit PriceQuantity Total <br />X 75.95 1.2811 138.00 <br />Labor Only to install. Material excluded <br />$72,998.49Subtotal for 06 - Wood, Plastic, and Composites <br />22 - Plumbing <br />22 42 16 00-0106 21" x 18" x 5-1/2" Deep, Single Compartment Stainless Steel Sink, <br />Undermount, 18 Gauge (Just Manufacturing Co. US-ADA-1821-A) <br />3 $1,623.03EA <br />Installation =x x 1,623.03 <br />FactorUnit PriceQuantity Total <br />X 422.30 1.2811 3.00 <br />Owner to install. Excluded labor. <br />$1,623.03Subtotal for 22 - Plumbing <br />Proposal Total <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub-totals and the proposal total is due to rounding. <br />$74,621.52 <br />The Percentage of NPP on this Proposal:79.83% <br />Page 1 of 1 <br />2/5/2018 <br />Subcontractor Listing <br />1422
The URL can be used to link to this page
Your browser does not support the video tag.