My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent Calendar 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
8I Consent Calendar 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:50:47 PM
Creation date
5/2/2018 12:50:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Consulting Services Agreement between City of San Leandro and 3/16/18 <br />Glass Architects for the Family Aquatic Center Competition Pool Exhibit A – Page 1 of 4 <br />EXHIBIT A SCOPE OF SERVICES <br /> <br /> <br />Background This contract is for the preparation of construction documents for the addition of a competition <br />pool at the Family Aquatics Center located at Washington Manor Park in San Leandro. Glass <br />Architects also prepared the construction documents on the original pool reconstruction project in 2005. At that time, the plans included an Additive Alternate for a competition pool and an <br />expanded parking lot. At the time of bidding, however, there was not enough funding for this <br />additive alternate and it was not constructed. The current project will implement a revised <br />version of this previous additive alternate. The original 2005 project building maintenance room <br />was sized for, and water pipe extensions installed, for such a future pool addition. <br />The pool will be designed for competitive swim meets and water polo games. A concept plan for <br />the competition pool is currently being finalized and the exact configuration and dimensions of <br />the pool will be determined prior to start of the design development. (The pool size with will be <br />approximately 25 yards by 25-28 meters). The new competition pool will be constructed in approximately the same location as that specified for the original additive alternate. However, <br />this area is currently used a lawn / sitting area which will be relocated to make room for the new <br />pool. <br /> <br />In addition to the pool, this project also includes the following improvements: <br />• A new expanded parking lot for approximately 130 cars with associated stormwater <br />treatment measures <br />• Bleacher seating <br />• Shade structures <br />• Perimeter fencing and lawn area <br />• Relocation of the park basketball court to the south of the Aquatic Center fenceline. <br />• Associated site work, including utilities, increased landscape, irrigation, hardscape, <br />fencing and site lighting. (Existing site utility services are expected to be adequate to <br />serve the new facility.) <br />• Installation of new equipment within the existing pool mechanical room <br />• Miscellaneous pool-related accessories such as a timing system, a scoreboard, lane lines, <br />deck furniture, pool covers, etc. <br /> <br />Scope of Work The consultant shall prepare Construction Plans, Technical Specifications, and Cost Estimate (PS&E) for the above project. Documents shall be suitable for permit approvals, competitive <br />public bid, and construction by the low bidder. <br /> <br />Consultant services fall within the following phases: Design Development; Construction Documents; Bidding; and Construction Support. <br /> <br />1503
The URL can be used to link to this page
Your browser does not support the video tag.