Laserfiche WebLink
MULFORD POINT DRIVEMONAR <br />C <br />H <br />B <br />A <br />Y <br />D <br />RI <br />V <br />E <br />PESCADOR POINT DRIVEEL TORITOCLUB HOUSEHORATIO'SOBSERVATIONMARINA INNYACHT CLUBPIERFUELINGDOCKHARBORMASTER'SOFFICE3Q1O/MK*H()%'APILE SUPPORTEDDECK TO REMAINDECKJPIER TO REMAINThis document shall not be used forconstruction unless signed and sealed forconstruction.Sheet No.Original SizeTitleProjectClientDesignerDrawnScalePlot Date:Filename:13 March 2018 - 5:32 PMN:\US\Emeryville\Projects\IR\8-chars\1111----\11119148-SAN LEANDRO MARINA DECOMM\06-CAD\Figures\11119148-Figure-003.dwgANSI BDatePlotted By: Jay ZhangProject No.Sheet ofReuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHDDraftingCheck01"Bar is one inch onoriginal size sheetDesignCheckIssueNo.DrawnApprovedDateProjectManagerCITY OF SAN LEANDROSAN LEANDRO MARINA DECOMMISSIONING PROJECT11119148RLMARCH 12, 2018GHD Inc.5900 Hollis Street Suite AEmeryville California 94608 USAT 1 510 420 0700 W www.ghd.comFIGURE 3DEMOLITION SUMMARY--J. ZHANGM. BEUTLER1" = 200'SHEET KEYNOTES1. REMOVE PIER SECURITY GATE AND ACCESSGANGWAY AND RESTORE RIP-RAP2. REMOVE BUTANE TANK AND ENCLOSURE3. REMOVE AND SALVAGE SEWER LIFTSTATION4. DEMOLISH LANDSIDE RESTROOM5. DEMOLISH PILE-SUPPORTED RESTROOMAND RESTORE RIP-RAP6. REMOVE FLOATING DOCKS, FINGER PIERS,PILES, AND ALL ATTACHED UTILITIES7. DEMOLISH AND REMOVE HARBORMASTER'SOFFICE AND RESTORE RIP-RAP8. DEMOLISH BLUE DOLPHIN PLATFORM ANDFOUNDATION AND RESTORE RIP-RAP9. DEMOLISH PILE SUPPORTED DECK (TIMBERWHARF) AND RESTORE RIP-RAPSHEET LEGENDDEMOLISH/REMOVE/SALVAGEMARINA FACILITIES AS DIRECTEDPER KEYNOTESLIMIT OF PROPOSEDDECOMMISSIONING WORKN0400'200'39