My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentation 2018 0618
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0618
>
4A Presentation 2018 0618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 6:36:15 PM
Creation date
6/14/2018 6:36:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/18/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
MULFORD POINT DRIVEMONAR <br />C <br />H <br />B <br />A <br />Y <br />D <br />RI <br />V <br />E <br />PESCADOR POINT DRIVEEL TORITOCLUB HOUSEHORATIO'SOBSERVATIONMARINA INNYACHT CLUBPIERFUELINGDOCKHARBORMASTER'SOFFICE3Q1O/MK*H()%'APILE SUPPORTEDDECK TO REMAINDECKJPIER TO REMAINThis document shall not be used forconstruction unless signed and sealed forconstruction.Sheet No.Original SizeTitleProjectClientDesignerDrawnScalePlot Date:Filename:13 March 2018 - 5:32 PMN:\US\Emeryville\Projects\IR\8-chars\1111----\11119148-SAN LEANDRO MARINA DECOMM\06-CAD\Figures\11119148-Figure-003.dwgANSI BDatePlotted By: Jay ZhangProject No.Sheet ofReuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHDDraftingCheck01"Bar is one inch onoriginal size sheetDesignCheckIssueNo.DrawnApprovedDateProjectManagerCITY OF SAN LEANDROSAN LEANDRO MARINA DECOMMISSIONING PROJECT11119148RLMARCH 12, 2018GHD Inc.5900 Hollis Street Suite AEmeryville California 94608 USAT 1 510 420 0700 W www.ghd.comFIGURE 3DEMOLITION SUMMARY--J. ZHANGM. BEUTLER1" = 200'SHEET KEYNOTES1. REMOVE PIER SECURITY GATE AND ACCESSGANGWAY AND RESTORE RIP-RAP2. REMOVE BUTANE TANK AND ENCLOSURE3. REMOVE AND SALVAGE SEWER LIFTSTATION4. DEMOLISH LANDSIDE RESTROOM5. DEMOLISH PILE-SUPPORTED RESTROOMAND RESTORE RIP-RAP6. REMOVE FLOATING DOCKS, FINGER PIERS,PILES, AND ALL ATTACHED UTILITIES7. DEMOLISH AND REMOVE HARBORMASTER'SOFFICE AND RESTORE RIP-RAP8. DEMOLISH BLUE DOLPHIN PLATFORM ANDFOUNDATION AND RESTORE RIP-RAP9. DEMOLISH PILE SUPPORTED DECK (TIMBERWHARF) AND RESTORE RIP-RAPSHEET LEGENDDEMOLISH/REMOVE/SALVAGEMARINA FACILITIES AS DIRECTEDPER KEYNOTESLIMIT OF PROPOSEDDECOMMISSIONING WORKN0400'200'39
The URL can be used to link to this page
Your browser does not support the video tag.