Laserfiche WebLink
QUANTITY <br />ITEM <br /> NO.DESCRIPTION NUMBER UNIT UNIT COST TOTAL <br />1 REMOVE PIER SECURITY GATE 10 EA $3,000.00 $30,000.00 <br />2 REMOVE BUTANE TANK AND ENCLOSURE 1 EA $5,000.00 $5,000.00 <br />3 REMOVE 1" GAS SERVICE 150 LF $50.00 $7,500.00 <br />4 REMOVE 4" SANITARY SEWER PIPE 800 LF $15.00 $12,000.00 <br />5 REMOVE 2" WATER SERVICE PIPE 10,400 LF $15.00 $156,000.00 <br />6 REMOVE ELECTRICAL CONDUIT AND CONDUCTOR 10,800 LF $10.00 $108,000.00 <br />7 REMOVE TELECOM CONDUIT AND CONDUCTOR 10,100 LF $10.00 $101,000.00 <br />8 DISCONNECT AND REMOVE ELECTRICAL SERVICE PEDESTAL 12 EA $400.00 $4,800.00 <br />9 REMOVE UTILITY POST WITH WATER METER 107 EA $100.00 $10,700.00 <br />10 REMOVE DOCK LIGHTING FIXTURE 30 EA $400.00 $12,000.00 <br />11 REMOVE MISC. UTILITY POST 8 EA $100.00 $800.00 <br />12 REMOVE DOCK LUMINAIRE 13 EA $1,000.00 $13,000.00 <br />13 REMOVE SLIP WATER SERVICE 258 EA $100.00 $25,800.00 <br />14 REMOVE FIRE EXTINGUISHER ENCLOSURE 26 EA $50.00 $1,300.00 <br />15 REMOVE WHARF HYDRANT 19 EA $500.00 $9,500.00 <br />16 REMOVE LOCKER BOX WITH UTILITY ACCESS 258 EA $50.00 $12,900.00 <br />17 REMOVE LOCKER BOX 169 EA $30.00 $5,070.00 <br />18 REMOVE AND SALVAGE SEWER LIFT STATION 1 LS $5,000.00 $5,000.00 <br />19 DEMO LANDSIDE RESTROOM 4 EA $50,000.00 $200,000.00 <br />20 DEMO PILE-SUPPORTED RESTROOM 2 EA $35,000.00 $70,000.00 <br />21 REMOVE AND DISPOSE - CONCRETE PILES 205 EA $1,100.00 $225,500.00 <br />22 REMOVE AND DISPOSE - TIMBER PILES 176 EA $900.00 $158,400.00 <br />23 REMOVE STEEL PILES 4 EA $1,200.00 $4,800.00 <br />24 REMOVE CONCRETE FLOATING DOCKS 58,520 SF $20.00 $1,170,400.00 <br />25 REMOVE TIMBER FLOATING DOCKS 50,460 SF $18.00 $908,280.00 <br />26 REMOVE AND DISPOSE COVERED BERTHS 13,720 SF $30.00 $411,600.00 <br />27 REMOVE GANGWAYS 10 EA $1,300.00 $13,000.00 <br />28 REMOVE CONCRETE ACCESS PIERS 2,140 SF $20.00 $42,800.00 <br />29 RESTORE RIP RAP ON MARINA BASIN SLOPES 2,650 TON $115.00 $304,750.00 <br />30 DEMO AND REMOVE HARBORMASTER'S OFFICE 1,530 SF $35.00 $53,550.00 <br />31 DEMO BLUE DOLPHIN RESTAURANT WHARF AND FOUNDATION 24,670 SF $15.00 $370,050.00 <br />32 DEMO FORMER OBSERVATION DECK 4,100 SF $15.00 $61,500.00 <br />Subtotal $4,515,000.00 <br />General Conditions 12%$541,800.00 <br />General Contractor's Fee (OH & P)8%$361,200.00 <br />Subtotal $5,418,000.00 <br />Bond & Insurance 3%$162,540.00 <br />Design, Permitting, Owner Administration and Construction Management 5%$270,900.00 <br />$5,851,440.00 <br />$877,716.00 <br />TOTAL $6,729,156.00 <br />City of San Leandro - Marina Decommissioning Project <br />Engineer's Opinion of Probable Construction Cost <br />COST <br />SUBTOTAL <br />ADDITIONAL ESTIMATING CONTINGENCY (15%) <br />52