My WebLink
|
Help
|
About
|
Sign Out
Home
10A Consent Calendar 2018 0618
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0618
>
10A Consent Calendar 2018 0618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 6:36:31 PM
Creation date
6/14/2018 6:36:28 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/18/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
d. Power Usage: Any increase or anticipated increase, in the usage of power related to <br />changes in structure or the Equipment shall be specifically provided to County in <br />writing. <br />e. Written Approval: No structures or equipment may be installed in the Licensed Area, or <br />elsewhere on the Property, including electrical and metering equipment without the prior <br />written approval of GSA-RPM. <br />i. Such approval does not replace the need or requirement for any permits, <br />including conditional use permits, and such approval is not a determination or <br />representation on the whether the Equipment meets any legal, technical or other <br />requirements. <br />ii. Licensee shall not commence construction until the County has approved <br />Licensee’s specifications and plans (“Plans”) for the Equipment at the Licensed <br />Area and Site. <br />iii. Following receipt of the County’s written approval of the Plans, Licensee will <br />provide the County with five (5) business days advance written notice before <br />commencing any construction or installation. <br />f. Replacements or Upgrades: Without change to footprint or frequencies, Licensee may <br />replace or upgrade the Equipment with advance notice to the County. Licensee must <br />adhere to all terms of this License including notification to County and equipment <br />limitations for such replacements or upgrades. Any increase or anticipated increase in the <br />usage of power or change in frequencies related to changes in structure or equipment <br />shall be specifically provided to County in writing. <br />g. Equipment Description: Licensee’s equipment installation shall be limited to those <br />specific devices and locations listed in Exhibit “B” attached hereto and incorporated <br />herein by reference. <br />h. Additional Equipment: In the event Licensee desires to install additional equipment or <br />antennas, changes shall first be approved in writing by County prior to such additional <br />installation. Should Licensee install additional equipment that exceed the dimensions of <br />the Equipment, or desires to increase the Licensed Area or the footprint beyond that set <br />forth in Exhibit “B” or for placement of additional equipment, Licensee shall first obtain <br />County’s written consent, and such increase to the Licensed Area may be subject to an <br />increase in the License fee. <br />i. Indemnification: Licensee specifically agrees to fully indemnify County for any and all <br />costs and damages that may be incurred by County related to the Equipment, including <br />863
The URL can be used to link to this page
Your browser does not support the video tag.