My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent Calendar 2018 0618
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0618
>
8K Consent Calendar 2018 0618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 6:36:51 PM
Creation date
6/14/2018 6:36:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/18/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3.The existing storm drain easement recorded on 8/08/1966 as Reel 1820, Image <br />208, in favor or Alameda County Flood Control and Water Conservation <br />District (ACFC&WCD) protects a County-operated pipe network known as <br />Line F". Said pipe network extends inside the northwestern property line of the <br />site and apparently drains storm water from the neighboring properties to the <br />north and west. Said pipe network, including the drain inlets, shall be protected <br />unless the applicant gains permission from ACFC&WCD to abandon, remove, <br />or alter it. <br />4.Most of the storm flows from the site were apparently captured and diverted to <br />the mill basement for use in Georgia Pacific's industrial processes. The water <br />was then discharged to the City's sanitary sewer system, not the District's storm <br />drain system. This diversion will be discontinued with the proposed project in <br />favor of a traditional storm drain system. The applicant shall therefore <br />demonstrate that capacity exists in the Line F storm network to accept flows <br />from the site. Because Line F is owned and operated by ACFC&WCD, the <br />applicant shall contact the District about conducting a study of this system. If <br />Line F" has been designed for sufficient capacity to handle storm water <br />discharge from the subject site for the proposed use, the applicant shall submit a <br />letter from County stating the same prior to Building Permit issuance. If the <br />network has insufficient capacity, an on-site detention system shall be designed <br />and constructed. The design of any detention system is subject to review and <br />approval by the City. <br />5.The storm drain network within Marina Boulevard where a connection is <br />proposed is operated by ACFC&WCD (Line F). Connections to Line F will <br />require a permit from the District. A copy of said permit shall be submitted to <br />the City prior to issuance of a Grading and/or Building Permit. <br />6.All proposed storm drain inlets shall be marked "NO DUMPING, DRAINS TO <br />BAY" as per the City of San Leandro Standard Plan Dwg. No. 204. All <br />proposed storm drain inlets that are not within bioretention areas shall have <br />trash capture devices. This note shall be included on Building Permit plan set. <br />D. Off-Site Dedication and Improvement <br />1.The applicant shall dedicate and improve to City standards a 10 foot strip of. <br />land across the Marina Boulevard property frontage in accordance with the <br />City's adopted Master Plan of City Streets. A plat map and legal description <br />prepared by a California registered Land Surveyor showing the area of 10 foot <br />right-of-way dedication shall be submitted to the City for review. Once the <br />documents are found to be technically correct, the applicant shall irrevocably <br />grant the right-of-way to the City prior to the issuance of a Building Permit. The <br />roadway improvements, including pavement, signs and markings, curb and <br />gutter, sidewalks, driveways, street trees, utilities, or any other necessary <br />infrastructure shall be completed prior to issuance of a Certificate of Occupancy. <br />Agreement to Conditions April 21,2017 <br />PLN 17-0005 Page 8 of 14726
The URL can be used to link to this page
Your browser does not support the video tag.