Laserfiche WebLink
File Number: 18-330 <br />Current Agency Policies <br />·Maintain and enhance San Leandro’s infrastructure. <br />Previous Actions <br />·On November 20, 2017, by Resolution No. 2017-165, the City Council authorized <br />increasing the scope and fee of WRECO’s contract to include design of pedestrian and <br />safety features on San Leandro Boulevard. <br />·On July 17, 2017, by Resolution No. 2017-112, the City Council awarded a construction <br />contract to DeSilva Gates Construction, L.P. for construction of phase 1. <br />·On July 17, 2017, by Resolution No. 2017-108, the City Council approved a contract with <br />NCE for the street repair design scope of work. <br />·On November 7, 2016, by Resolution No. 2016-142, the City Council approved a contract <br />with WRECO to design the street repairs. <br />Committee Review and Actions <br />On May 2, 2018 the City Council Facilities and Transportation Committee reviewed options for <br />changes to vehicle and bicycle lane configurations on Hesperian Boulevard from Thornally Drive <br />to Springlake Drive. The Committee directed staff to collect public input and defer work on <br />Hesperian Boulevard until a decision is made for the lane configuration. <br />Applicable General Plan Policies <br />Policy CSF-6.8 Maintenance: <br />Ensure that sufficient funding is provided for the ongoing maintenance of City-owned facilities, <br />including streets, street lights, traffic signals, landscaping, street trees, storm drains, public <br />buildings and other infrastructure. <br />Environmental Review <br />This project is categorically exempt from the California Environmental Quality Act (CEQA) per <br />Section 15301(c) of the CEQA guidelines. The Notice of Exemption was filed with the Alameda <br />County Recorder on March 24, 2017. <br />Summary of Public Outreach Efforts <br />The streets to be repaved are posted on the City’s website, and were displayed at the Cherry <br />Festival and both of the 2018 Town Hall meetings. Properties adjacent to the work will receive a <br />notification from the City and a second notification from the Contractor prior to the work. <br />A neighborhood meeting was held July 10, 2018 to discuss options for reconfiguring Hesperian <br />Boulevard and work on that street will be deferred to a subsequent project. <br />The Notice to Bidders was published in the Daily Review, the South County Post, Visión Hispana <br />Page 4 City of San Leandro Printed on 7/10/2018