My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent Calendar 2018 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0305
>
Packet 2018 0716
>
8G Consent Calendar 2018 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 12:33:53 PM
Creation date
7/11/2018 12:33:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/16/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
g:\share\dallen\california\2938-13 public highway at grade crossing-030113.doc <br />the Political Body shall pay to the Railroad all actual costs incurred by the Railroad in <br />connection with the Project up to the date of termination, including, without limitation, all <br />actual costs incurred by the Railroad in connection with reviewing any preliminary or final <br />Project Plans. <br /> <br />Section 12. CONDITIONS TO BE MET BEFORE <br /> POLITICAL BODY CAN COMMENCE WORK <br /> <br />Neither the Political Body nor the Contractor may commence any work within the <br />Crossing Area or on any other Railroad property until: <br /> <br />(i) The Railroad and Political Body have executed this Agreement. <br /> <br />(ii) The Railroad has provided to the Political Body the Railroad’s written <br />approval of the Plans. <br /> <br />(iii) Each Contractor has executed Railroad’s Contractor’s Right of Entry <br />Agreement and has obtained and/or provided to the Railroad the insurance <br />policies, certificates, binders, and/or endorsements required under the <br />Contractor’s Right of Entry Agreement. <br /> <br />(iv) Each Contractor has given the advance notice(s) required under the <br />Contractor's Right of Entry Agreement to the Railroad Representative named <br />in the Contactor's Right of Entry Agreement. <br /> <br />Section 13. FUTURE PROJECTS <br /> <br /> Future projects involving substantial maintenance, repair, reconstruction, renewal <br />and/or demolition of the Roadway shall not commence until Railroad and Political Body <br />agree on the plans for such future projects, cost allocations, right of entry terms and <br />conditions and temporary construction rights, terms and conditions. <br /> <br />Section 14. ASSIGNMENT; SUCCESSORS AND ASSIGNS <br /> <br /> A. Political Body shall not assign this Agreement without the prior written <br />consent of Railroad. <br /> <br /> B. Subject to the provisions of Paragraph A above, this Agreement shall inure to <br />the benefit of and be binding upon the successors and assigns of Railroad and Political <br />Body. <br /> <br />Section 15. SPECIAL PROVISIONS PERTAINING TO AMERICAN <br /> RECOVERY AND REINVESTMENT ACT OF 2009 <br /> <br /> If the Political Body will be receiving American Recovery and Reinvestment Act <br />("ARRA") funding for the Project, the Political Body agrees that it is responsible in
The URL can be used to link to this page
Your browser does not support the video tag.