Laserfiche WebLink
Public Highway At-Grade Crossing 03/01/13 <br />Standard Form Approved, AVP-Law <br />Exhibit B <br />Page 4 of 4 <br />g:\share\dallen\california\2938-13 public highway at grade crossing-030113.doc <br />Section 9. RESTORATION OF PROPERTY. <br /> <br />In the event Railroad authorizes Contractor to take down any fence of Railroad or in any manner move or disturb any of <br />the other property of Railroad in connection with the work to be performed by Contractor, then in that event Contractor shall, as <br />soon as possible and at Contractor's sole expense, restore such fence and other property to the same condition as the same <br />were in before such fence was taken down or such other property was moved or disturbed. Contractor shall remove all of <br />Contractor's tools, equipment, rubbish and other materials from Railroad's property promptly upon completion of the work, <br />restoring Railroad's property to the same state and condition as when Contractor entered thereon. <br /> <br />Section 10. WAIVER OF DEFAULT. <br /> <br />Waiver by Railroad of any breach or default of any condition, covenant or agreement herein contained to be kept, <br />observed and performed by Contractor shall in no way impair the right of Railroad to avail itself of any remedy for any <br />subsequent breach or default. <br /> <br />Section 11. MODIFICATION - ENTIRE AGREEMENT. <br /> <br />No modification of this Agreement shall be effective unless made in writing and signed by Contractor and Railroad. This <br />Agreement and the exhibits attached hereto and made a part hereof constitute the entire understanding between Contractor <br />and Railroad and cancel and supersede any prior negotiations, understandings or agreements, whether written or oral, with <br />respect to the work to be performed by Contractor. <br /> <br />Section 12. ASSIGNMENT - SUBCONTRACTING. <br /> <br />Contractor shall not assign or subcontract this Agreement, or any interest therein, without the written consent of the <br />Railroad. Contractor shall be responsible for the acts and omissions of all subcontractors. Before Contractor commences any <br />work, the Contractor shall, except to the extent prohibited by law; (1) require each of its subcontractors to include the <br />Contractor as "Additional Insured" in the subcontractor's Commercial General Liability policy and Business Automobile policies <br />with respect to all liabilities arising out of the subcontractor's performance of work on behalf of the Contractor by endorsing <br />these policies with ISO Additional Insured Endorsements CG 20 26, and CA 20 48 (or substitute forms providing equivalent <br />coverage; (2) require each of its subcontractors to endorse their Commercial General Liability Policy with "Contractual Liability <br />Railroads" ISO Form CG 24 17 10 01 (or a substitute form providing equivalent coverage) for the job site; and (3) require each <br />of its subcontractors to endorse their Business Automobile Policy with "Coverage For Certain Operations In Connection With <br />Railroads" ISO Form CA 20 70 10 01 (or a substitute form providing equivalent coverage) for the job site. <br />