My WebLink
|
Help
|
About
|
Sign Out
Home
8U Consent Calendar 2018 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0305
>
Packet 2018 0716
>
8U Consent Calendar 2018 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 12:34:03 PM
Creation date
7/11/2018 12:34:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/16/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:049724.01 <br />San Leandro Library Boiler Additional Scope Supplemental <br />27 - Communications <br />27 14 13 16 0004 1 Pair #12 AWG, Solid, Low Voltage, Placed In Conduit, Alarm And <br />Communications Cable <br />52 $2,254.51MLF <br />Installation =x x 2,254.51FactorUnit PriceQuantity Total <br /> 1,813.47 1.2432 1.00 <br />Comm wire and conduit required for flow meter and motorized control valve <br />$2,254.51Subtotal for 27 - Communications <br />31 - Earthwork <br />31 32 36 00 0045 Mobilization / Demobilization Less than 50 miles53 $2,486.40EA <br />Installation =x x 2,486.40 <br />FactorUnit PriceQuantity Total <br /> 2,000.00 1.2432 1.00 <br />Mobilization of drilling / rebar contractor <br />31 32 36 00 0045 Mobilization / Demobilization Less than 50 miles54 $2,486.40EA <br />Installation =x x 2,486.40FactorUnit PriceQuantity Total <br /> 2,000.00 1.2432 1.00 <br />Mobilization of insulating contractor <br />31 32 36 00 0045 Mobilization / Demobilization Less than 50 miles55 $2,486.40EA <br />Installation =x x 2,486.40FactorUnit PriceQuantity Total <br /> 2,000.00 1.2432 1.00 <br />Mobilization of electrical contractor <br />31 32 36 00 0045 Mobilization / Demobilization Less than 50 miles56 $2,486.40EA <br />Installation =x x 2,486.40 <br />FactorUnit PriceQuantity Total <br /> 2,000.00 1.2432 1.00 <br />Mobilization of concrete sub contractor. 2 mobilizations included (1) demo & (1) install of concrete <br />$9,945.60Subtotal for 31 - Earthwork <br />Proposal Total <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub-totals and the proposal total is due to rounding. <br />$105,727.31 <br />Page 7 of 7 <br />7/2/2018 <br />Contractor's Price Proposal - Detail
The URL can be used to link to this page
Your browser does not support the video tag.