Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:049724.01 <br />San Leandro Library Boiler Additional Scope Supplemental <br />27 - Communications <br />27 14 13 16 0004 1 Pair #12 AWG, Solid, Low Voltage, Placed In Conduit, Alarm And <br />Communications Cable <br />52 $2,254.51MLF <br />Installation =x x 2,254.51FactorUnit PriceQuantity Total <br /> 1,813.47 1.2432 1.00 <br />Comm wire and conduit required for flow meter and motorized control valve <br />$2,254.51Subtotal for 27 - Communications <br />31 - Earthwork <br />31 32 36 00 0045 Mobilization / Demobilization Less than 50 miles53 $2,486.40EA <br />Installation =x x 2,486.40 <br />FactorUnit PriceQuantity Total <br /> 2,000.00 1.2432 1.00 <br />Mobilization of drilling / rebar contractor <br />31 32 36 00 0045 Mobilization / Demobilization Less than 50 miles54 $2,486.40EA <br />Installation =x x 2,486.40FactorUnit PriceQuantity Total <br /> 2,000.00 1.2432 1.00 <br />Mobilization of insulating contractor <br />31 32 36 00 0045 Mobilization / Demobilization Less than 50 miles55 $2,486.40EA <br />Installation =x x 2,486.40FactorUnit PriceQuantity Total <br /> 2,000.00 1.2432 1.00 <br />Mobilization of electrical contractor <br />31 32 36 00 0045 Mobilization / Demobilization Less than 50 miles56 $2,486.40EA <br />Installation =x x 2,486.40 <br />FactorUnit PriceQuantity Total <br /> 2,000.00 1.2432 1.00 <br />Mobilization of concrete sub contractor. 2 mobilizations included (1) demo & (1) install of concrete <br />$9,945.60Subtotal for 31 - Earthwork <br />Proposal Total <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub-totals and the proposal total is due to rounding. <br />$105,727.31 <br />Page 7 of 7 <br />7/2/2018 <br />Contractor's Price Proposal - Detail