Laserfiche WebLink
<br />City of San Leandro Heron Bay Maintenance Assessment District No. 96-3 Page 6 <br /> <br /> <br />Trail Maintenance <br />City staff will hire a contractor to complete pavement repairs on sections of the trail where <br />tree roots have damaged the asphalt. The work will involve digging out small sections of <br />pavement, trimming back tree roots and installing new asphalt patches. <br /> <br />Shoreline Signs, Parking and Accessible Walkway <br />In conformance with the City’s updated permit with the San Francisco Bay Conservation <br />and Development Commission (BCDC), wayfinding signage along the Bay Trail will be <br />repaired since the existing signage has been worm by weather and sun-exposure. <br /> <br />Tide Gate Repair <br />City staff completes repairs to tide gates on an as-needed basis to assure their proper <br />operation. Repairs include; reconnecting the flap gates and the frames, replacing rotted <br />sections of the drain pipes, reattaching the screen latch connections, replacing damaged <br />screen bars and screens, and installing associated stainless-steel lubrication tubings. <br /> <br /> <br />