Laserfiche WebLink
Last Revised: 06/01/16 Page 5 Agreement <br />Annual Street Overlay/Rehabilitation 2016-17, Phase 2 Project No.2017.0050 <br />Unclassified excavation <br />One Hundred Two Dollars <br />$102.00 <br />$16,728.00 <br />20 <br />for roadway per section <br />164 <br />Cy <br />300-2 <br />21 <br />Aggregate Base per <br />250 <br />TN <br />Seventy Dollars <br />$70.00 <br />$17,500.00 <br />section 301-2 <br />Temporary Traffic <br />Thirty -Two Thousand <br />$32,000.00 <br />$32,000.00 <br />22 <br />Control per part 6 and <br />1 <br />LS <br />Dollars <br />section 315-2. <br />Striping and pavement <br />Forty -Seven Thousand Four <br />$47,414.00 <br />$47,414.00 <br />23 <br />markings per section <br />1 <br />LS <br />Hundred Fourteen Dollars <br />314 <br />Remove and Rebuild <br />Three Thousand Five <br />$3,500.00 <br />$52,500.00 <br />24 <br />Survey Monument per <br />15 <br />EA <br />Hundred Dollars <br />section 309 <br />25 <br />Surveying per section <br />1 <br />LS <br />Six Thousand Seven <br />$6,750.00 <br />$6,750.00 <br />2-9 <br />Hundred Fifty Dollars <br />Install surface mounted <br />Two Thousand Dollars <br />$2,000.00 <br />$4,000.00 <br />26 <br />truncated domes per <br />2 <br />EA <br />City standard plan <br />106D <br />Rubber speed cushion <br />Six Thousand Nine Hundred <br />$6,900.00 <br />$110,400.00 <br />27 <br />6'-6" wide per section <br />16 <br />EA <br />Dollars <br />316-1 <br />Rubber speed cushion <br />Seven Thousand Two <br />$7,200.00 <br />$28,800.00 <br />28 <br />9'-2" wide per section <br />4 <br />EA <br />Hundred Dollars <br />316-1 <br />AC speed cushion on <br />Five Thousand Dollars <br />$5,000.00 <br />$20,000.00 <br />29 <br />36' wide street per <br />4 <br />EA <br />section 316 <br />Salvage sign and install <br />Five Hundred Twenty -Five <br />$525.00 <br />$1,050.00 <br />30 <br />on new post per section <br />2 <br />EA <br />Dollars <br />315-1 <br />Furnish W13-1 and <br />Four Hundred Fifty Dollars <br />$450.00 <br />$900.00 <br />31 <br />W17-1 and install both <br />2 <br />EA <br />on existing post per <br />section 315-1 <br />Furnish W13-1 and <br />Five Hundred Fifty Dollars <br />$550.00 <br />$6,600.00 <br />32 <br />W17-1 and install both <br />12 <br />EA <br />on new post per section <br />315-1 <br />Remove and Reset <br />'Three Thousand Dollars <br />$3,000.00 <br />$18,000.00 <br />33 <br />Manhole per section <br />6 <br />EA <br />301-1.6 <br />Remove and Reset <br />One Thousand Five Hundred <br />$1,500.00 <br />$22,500.00 <br />34 <br />Water Valve Pot per <br />15 <br />EA <br />Dollars <br />section 301-1.6 <br />Lower and Raise <br />Three Thousand Dollars <br />$3,000.00 <br />$42,000.00 <br />35 <br />Manhole per section <br />14 <br />EA <br />301-1.6 <br />Lower and Raise Water <br />Two Thousand Dollars <br />$2,000.00 <br />$28,000.00 <br />36 <br />Valve Pot per section <br />14 <br />EA <br />301-1.6 <br />Last Revised: 06/01/16 Page 5 Agreement <br />Annual Street Overlay/Rehabilitation 2016-17, Phase 2 Project No.2017.0050 <br />