My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2018-084
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2018
>
Reso 2018-084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:54:55 AM
Creation date
7/27/2018 9:45:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/16/2018
Retention
PERM
Document Relationships
Reso 2018-085
(Amended by)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail Maintenance <br />City staff will hire a contractor to complete pavement repairs on sections of the trail where <br />tree roots have damaged the asphalt. The work will involve digging out small sections of <br />pavement, trimming back tree roots and installing new asphalt patches. <br />Shoreline Signs,i Accessible <br />In conformance with the City's updated permit with the San Francisco Bay Conservation <br />and Development Commission (BCDC), wayfinding signage along the Bay Trail will be <br />repaired since the existing signage has been worm by weather and sun -exposure. <br />Tide it <br />City staff completes repairs to tide gates on an as -needed basis to assure their proper <br />operation. Repairs include; reconnecting the flap gates and the frames, replacing rotted <br />sections of the drain pipes, reattaching the screen latch connections, replacing damaged <br />screen bars and screens, and installing associated stainless-steel lubrication tubings. <br />City of San Leandro Heron Bay Maintenance Assessment District No. 96-3 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.