Laserfiche WebLink
This section of the Statement of Work covers the work that will be performed during the Execution <br />phase of this project. <br />Configuration and Implementation Tasks <br />This section details the Configuration and Implementation 'Tasks of the project. <br />Firewall Migration <br />In -scope: 2x 2140 <br />Tasks: <br />)o- Basic Configuration <br />flostname <br />IP addressing <br />Build HA configuration <br />Configure Failover <br />Basic routing <br />o Dynamic or Static as discussed on design phase <br />Management Settings <br />Create and build objects in FMC <br />• Build NAT, Objects, Services Groups and ACI., <br />• Apply IPS and AMP Policies as discussed on design phase <br />Prepare new firewall configuration for internet edge <br />Create Zones as discussed in design and Plan phase <br />Create Access policies <br />Register devices with FMC <br />Publish Anyconnect image on ASA <br />Build RA configuration <br />o l x Tunnel Group and GP <br />Enable Group policy setting as discussed in Design and Plan phase <br />• DNS <br />• DHCP <br />• Tunneling <br />Clear ARP cache on upstream router if required <br />Test <br />• Internet <br />• Email <br />• Inbound NAT <br />• Application access <br />• IPS Policies and AMP Policies and URI, Policies <br />• Firewall health check <br />VPN <br />Consulting Services Agreement between City of San Leandro and 07/16/2018 <br />ConvergeOne, Inc. for Cisco Firewall Upgrade Project Exhibit A - Page 4 of 10 <br />