My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2018098105
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2018
>
Inst 2018098105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:25:21 AM
Creation date
8/28/2018 2:04:10 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/19/2018
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XII. <br />route plan shall be reviewed and approved by the City Transportation Administrator prior <br />to receipt of the grading permit. <br />D. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall be no <br />truck hauling activity on Saturdays, Sundays and Federal holidays. <br />E. Procedures with the highest noise potential shall be scheduled for daylight hours, when <br />ambient noise levels are highest. <br />F. The contractor(s) shall be required to employ the quietest among alternative equipment <br />or to muffle/control noise from available equipment. <br />G. All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) Trucks hauling <br />construction materials shall be covered with tarpaulins or other effective covers; 3) <br />Streets surrounding demolition and construction sites shall be swept at least once per day; <br />and 4) Paving and planting shall be done as soon as possible. City shall charge developer, <br />and developer shall pay, for all costs of sweeping city streets in the vicinity of the project <br />as necessary to control dust and spillage. <br />H. The property shall be secured during construction with a six (6) foot tall chain link fence <br />and any other security measures in accordance with recommendation of the San Leandro <br />Police Department. <br />I. Pest and vermin control shall be instituted prior to the demolition and construction of the <br />project. <br />GENERAL CONDITIONS <br />A. Developer shall pay its City development, permitting, and plan checking fees in <br />accordance with the fee schedules in effect at the time of the Building Permit approval. <br />B. Prior to issuance of building permits, the applicant shall pay school fees as mandated by <br />the State of California. <br />C. All mechanical equipment shall be designed and maintained to comply with City noise <br />standards. <br />D. On-site lighting shall be designed and located so as to not interfere with traffic on <br />adjacent streets and so as not to shine on adjacent properties, details subject to the <br />approval of the City Engineer and the Community Development Director. <br />E. The approvals granted by the City as a result of this application, as well as the Conditions <br />of Approval, shall be recorded in the Office of the County Recorder of Alameda County. <br />Agreement to Conditions January 19, 2018 <br />PLN 17-0061 Page 13 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.