My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2018 0904
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0904
>
8L Consent 2018 0904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 5:59:03 PM
Creation date
8/28/2018 5:59:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/4/2018
Retention
PERM
Document Relationships
Reso 2018-097
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-325 <br />·Staff also notified twenty-one builders’ exchanges and construction data firms as well as a <br />list of contractors that asked to be notified of bidding opportunities via email. <br />·The project is described on the Engineering and Transportation Department website. <br />·Two mandatory pre-bid meetings were held on June 6 and June 13, 2017. The intent of <br />these meetings was to inform bidders of the project details including the City’s Local <br />Inclusion Ordinance and Community Workforce Agreement. <br />·On September 5, 2017, the proposed street diet scheme for San Leandro Boulevard was <br />presented at the City Council meeting. <br />·A neighborhood meeting was held on September 27, 2017 regarding the street diet <br />scheme proposed for San Leandro Boulevard. <br />Fiscal Impacts <br />The original estimated cost of phase 1 of the Annual Street Overlay / Rehabilitation <br />2016-17 project was $3,239,963 when presented to City Council on July 17, 2017. The <br />total actual cost of phase 1 is $3,920,092, which includes design, construction contract <br />and construction administration. <br />A summary of the construction contract with De Silva Gates is as follows: <br />Original Contract $3,048,462 <br />Change Orders $249,033 (8.2%) <br />Total Contract Amount $3,297,495 <br />Budget Authority <br />This project was funded with the following appropriations: <br />Account No. Reso., Appropriation Dates & Source Amount <br />141-39-024 FY 2016-17 Budget, Measure BB Grant $3,000,000 <br />141-38-377 FY 2016-17 Budget, Measure BB $1,275,000 <br />144-38-377 FY 2016-17 Budget, Measure B $ 310,000 <br />142-38-377 FY 2016-17 Budget, Gas Tax $ 380,000 <br />210-38-377 FY 2016-17 Budget, General Fund $1,000,000 <br />Total $5,965,000 <br />Attachment to Staff Report <br />·Photos of Completed Streets <br />PREPARED BY: Austine Osakwe, Senior Engineer, Engineering and Transportation, <br />Department <br />Page 4 City of San Leandro Printed on 8/28/2018 <br />148
The URL can be used to link to this page
Your browser does not support the video tag.