My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2018 0917
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0917
>
8D Consent Calendar 2018 0917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 4:26:46 PM
Creation date
9/11/2018 4:26:41 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/17/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />40 <br />27.3.1.2 If the condition is susceptible to cure, the City will provide <br />notice to Licensee of the City’s determination, the underlying reasons for the <br />determination, and provide a 30-day cure period following which the affected Pole <br />Licenses will terminate if Licensee has not effected a cure. <br />27.3.1.3 If the condition is not susceptible to cure in the City’s sole <br />judgment, the City will have the right to terminate the affected Pole Licenses on <br />30 days’ notice to Licensee of the City’s determination. <br />27.3.1.4 The City will endeavor to accommodate a request by Licensee <br />to relocate the Pole License and related Equipment, at Licensee’s sole cost and <br />expense, to another City Pole mutually acceptable to Licensee and City. <br />27.3.2 Removal of Equipment. The City in its sole discretion may determine that <br />exigent circumstances require, for reasons of public, health, safety, or needs of the City to <br />provide street lighting, utilities, or other municipal services, that Licensee remove the <br />Equipment from a particular City Pole on 72 hours’ notice. Licensee shall remove the <br />Equipment from the identified City Pole within the 72-hour period or any longer time to which <br />the City agrees. The applicable Pole License will terminate as to the identified City Pole upon <br />expiration of the 72-hour period. <br />27.3.3 City Pole Removal. The City has the right to remove any City Pole that it <br />determines in its sole judgment is unnecessary for its street light operations. If the City <br />decides to remove a City Pole, it will make reasonable efforts to provide at least 90 days’ <br />notice to Licensee, but the City’s rights under this Subparagraph will not be affected by its <br />failure to provide less than 90 days’ notice. Upon removal of a City Pole, either party will have <br />the right to terminate the Pole License as to the affected City Pole as of the last day of the <br />month of removal. The City will endeavor to accommodate a request by Licensee to relocate <br />the Pole License and related Equipment, at Licensee’s sole cost and expense, to another City <br />Pole mutually acceptable to Licensee and City. <br />27.3.4 Replacement, Relocation, or Upgrading of City Poles. The City has the right to <br />replace, relocate, or add City equipment to, and remove Licensee’s Equipment from, any City <br />Pole or License Area that the City determines in its sole judgment is necessary for its <br />municipal operations, including, but not limited to, LED conversion or installation of solar <br />capabilities. If the City decides to replace or relocate a City Pole or add equipment requiring <br />the removal of Licensee’s Equipment, the City will make reasonable efforts to provide at least <br />90 days’ notice to Licensee, but the City’s rights under this Subparagraph will not be affected <br />by its failure to provide less than 90 days’ notice. Licensee may choose either to terminate the <br />applicable Pole License as to the replacement, relocated, or upgraded City Pole or, only if <br />feasible in the discretion of the City’s Engineering and Transportation Department, install <br />Licensee’s Equipment on the replacement, relocated, or upgraded City Pole at Licensee’s <br />sole cost. The City will endeavor to accommodate a request by Licensee to relocate the Pole <br />License and related Equipment, at Licensee’s sole cost and expense, to another City Pole <br />mutually acceptable to Licensee and City. <br />27.3.5 Future Use of Existing City Conduit. <br />27.3.5.1 If City conduit space is part of a License Area, and the City needs <br />to use such City conduit space for future upgrade and expansion of its street light <br />system, the City may require Licensee’s wiring to be removed from the City’s conduit. <br />The City will use reasonable efforts to give Licensee at least 90 days’ notice that the <br />wiring will be removed, but the City’s failure to give notice or delivery of less than 90 <br />days’ notice will not affect the City’s rights under this Subsection. In either case, the <br />City will provide Licensee with a date by which its wiring must be removed.
The URL can be used to link to this page
Your browser does not support the video tag.