My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action Calendar 2018 0917
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0917
>
10A Action Calendar 2018 0917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 4:29:06 PM
Creation date
9/11/2018 4:28:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/17/2018
Retention
PERM
Document Relationships
Reso 2018-116
(Message)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> 111 <br />Phase 1 <br /> <br />• Network Costs = $3.0M - $3.5M (estimate to establish fiber in existing conduit) <br />• Network Electronics = $250,000 (existing model, no lit fiber) <br />• Average cost per lateral = $6,000 <br />• Total footage – 108,904 feet <br />• Total number of businesses within 500 ft – 3024 <br />• City owns 30 fiber strands <br />• Current LSL business model – Opportunistically lease dark fiber to ISP’s or <br />businesses <br />• Limited opportunity to offer 5G backhaul services given network layout/design <br /> <br /> <br />Phase 2 involves the expansion of San <br />Leandro’s existing fiber network to <br />serve more area businesses, anchor <br />institutions, and municipal facilities. <br />The proposed additions include 72,500 <br />feet of additional fiber to be placed in <br />existing conduit and through the <br />construction of new conduit laterals. <br /> <br />Phase 2 will allow for additional <br />connections of nearly 2,800 <br />businesses within a five hundred (500) <br />foot “buffer zone” of the network, <br />allowing San Leandro to provide <br />additional fiber and “lit” services to <br />service providers, who will in turn <br />provide connectivity to businesses. <br /> <br /> <br /> Phase 2 <br />• Network Costs = $9.0M - $9.5M (estimate to establish fiber in existing conduit and <br />b\build new conduit) <br />• Network Electronics = $1,000,000 (recommended model) <br />• Average cost per lateral = $6,000 <br />• Total footage – 72,500 feet <br />• Total number of businesses within 500 ft – 2782 <br />• Vertical Assets (light poles) – 1,765 <br />• City owns all fiber strands <br />• Recommended business model – City provides laterals and “lit” services to ISP’s <br />• Opportunity to offer 5G backhaul services given network layout/design <br />Figure 65. Phase 2 - Proposed Network Expansion
The URL can be used to link to this page
Your browser does not support the video tag.