My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2018-116
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2018
>
Reso 2018-116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:00:44 AM
Creation date
9/19/2018 5:25:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
9/17/2018
Retention
PERM
Document Relationships
10A Action Calendar 2018 0917
(Attachment)
Path:
\City Clerk\City Council\Agenda Packets\2018\Packet 2018 0917
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This arrangement would provide the greatest positive impact to the City, while leaving <br />substantial fiber capacity that could be used to support the municipal operations of San <br />Leandro well into the future. The additional capacity will help "future proof' San Leandro, <br />allowing the City to take advantage of future technologies that require robust connectivity, <br />at little incremental cost. <br />Recommendation #7: Incorporate Broadband Strategies <br />San Leandro should work to incorporate broadband governance strategies into the daily <br />operations of all City departments and work with local and regional public agencies and <br />private investors, especially for dig once and joint trench, leveraging streetlight poles for <br />in-kind fiber swaps during small cell lease negotiations, during development review <br />committee meetings, capital project budget considerations and during development <br />agreement negotiations. <br />FIBER MANAGEMENT <br />The Plan also identified specific challenges the City currently faces in managing its fiber <br />network. For instance, fiber tracking has historically been done on computer-aided <br />drawing (CAD) files, spreadsheets and similar database files. However, these can <br />become outdated overtime. In addition, fiber strands are not tracked in GIS; only conduit <br />is. This presents difficulty when fiber is spliced or changes need to be made as previous <br />modifications may not be known to all parties involved resulting in fiber strands not <br />connecting where they are supposed to or not being available when they should be. <br />Specific steps can be taken in order to improve this situation: <br />• Conduct a fiber audit to ascertain usage throughout the entire fiber optic network. <br />This should include cataloging connectivity of each strand and bundle. <br />• Denote the number of strands in each section of the network. For example, some <br />areas have 48 strands whereas others have 72 or more. <br />• Mark all City strands within Lit San Leandro bundles. <br />• Identify quality of fiber strands throughout the network by measuring throughput <br />and performance. <br />• Procure a fiber strand management software that can integrate with the City GIS <br />system for tracking and planning purposes <br />• Develop an in-house process with the IT Division, GIS, Public Works, and <br />Engineering Departments for reporting all fiber installations, changes, updates, <br />123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.