Laserfiche WebLink
Figure 7 Model B Financial Snapshot <br />Model C - Combined Network Models: assumes a combined Phase 1 and Phase 2 <br />costs and deployment assuming one entity (City, Lit San Leandro or other) were to build <br />and maintain the network. <br />Figure 8, Model C Financial Snapshot <br />The financial models presented here demonstrate potential cost models for building and <br />maintaining a broadband network for the City of San Leandro. These models should be <br />viewed as only three of many available options to the City and assume more of a total <br />finance scenario rather than incorporating cost savings from opportunistic builds or grant <br />funding options. The City of San Leandro should assume that much of this network will <br />be paid for by grant funds, or that the cost of building the network can be greatly reduced <br />by joint trenching, use of existing assets or opportunistic builds as they present <br />themselves. <br />1511 <br />City of San Leandro, CA <br />Fiber Master Plan <br />