Laserfiche WebLink
Design05/01/1902/18/20210d <br />Preliminary Design: treatment wetland05/01/1910/15/19120d <br />Preliminary Design: MEP10/16/1902/18/2090d <br />Phase 2 - Area shoreline planning05/01/1911/05/19135d <br />Outreach to area shoreline landowners05/01/1907/23/1960d <br />Conceptual Designs and Constraints Analysis07/24/1909/03/1930d <br />Outreach to local groups09/04/1909/24/1915d <br />Conceptual project description/fundraising plan09/25/1911/05/1930d <br />Signage and acknowledgement05/01/1906/14/1933d <br />Design and creation of signage along Bay Trail05/01/1906/14/1933d <br />Agency Consultation435874370383d <br />Regional Water Board: 401/NPDES/General Construction05/02/1906/13/1931d <br />Informal Consultation <br />Documented Final Permitting Process <br />Alameda Co Mosquito Abatement District05/02/1905/23/1916d <br />Informal Consultation to inform design <br />Documented Final Permitting Process <br />BCDC: Administrative Permit06/14/1907/05/1916d <br />Informal Consultation <br />Documented Final Permitting Process <br />DFW: Streambed Alteration/CESA07/08/1907/29/1916d <br />Informal Consultation <br />Documented Final Permitting Process <br />ACOE: CWA Section 40407/08/1907/29/1916d <br />Informal Consultation <br /> <br />