My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2018 1119
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 1119
>
8I Consent 2018 1119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 2:34:49 PM
Creation date
11/14/2018 9:42:22 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/19/2018
Retention
PERM
Document Relationships
Agmt 2018 NPSA Ross Recreation Equipment, Marina Park Playground Installation #3507
(Approved)
Path:
\City Clerk\City Council\Agreements\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />$91,226.61 <br /> <br />00016148 <br /> <br />1. PRE-DELIVERY INSTRUCTIONS: Contractor must notify Ross Recreation of any requested delivery changes at least 2 weeks prior to <br />shipment. If the delivery address on the contract is not correct, please contact our office immediately as once your order leaves the factory, a <br />reconsignment fee may be added. If Ross Recreation is not installing your equipment you are responsible for offloading and having any <br />equipment required for offloading the shipment; the truck drivers are not obligated to offload your shipment. If Ross Recreation is installing your <br />equipment, the installers will offload the equipment. It is your responsibility to mark all underground utilities before installation (call USA North, <br />1-800-227-2600). <br />2. DELIVERY INSTRUCTIONS: Make sure the piece count matches the Freight Bill you are signing so that you are receiving a complete and <br />intact shipment. Make sure all pieces you are receiving are actually addressed to you, as trucks carry multiple shipments. Any shortages or <br />visible damage must be noted on both copies of the Freight Bill, and both copies signed. Jointly inspect each piece for signs of damage (i.e. <br />torn packaging, punctures, etc.) with the driver. Notations on the Freight Bill should be as detailed as possible to avoid controversy at a later <br />date if a claim is necessary. If you have a camera, taking photos of any damaged packaging is recommended to expedite resolution. <br />3. POST-DELIVERY INSTRUCTIONS: After receipt of order, inventory your shipment. All shortages must be reported within 30 days of <br />receiving order. When inspecting the equipment, please minimize the amount of tearing of the packaging and DO NOT dispose of packaging. If <br />concealed damage is found, a Carrier inspection must take place within 15 days from the time of delivery to protect your rights as the <br />Consignee. If an inspection is necessary, please contact Ross Recreation as soon as possible. Store your equipment in a safe and secure <br />location before installation. Returns are subject to a restocking fee. Credit on returns is contingent upon credit issued from the factory; <br />materials must be packaged well and received at the factory in new and resalable condition. <br />4. DELAY: Ross Recreation shall be excused for any delay in completion of the contract caused by acts of God, acts of the Owner or <br />Contractor or the Owner’s or Contractor's agent, employee or independent contractor, stormy weather, labor trouble, acts of public utilities, <br />public bodies or inspectors, extra work, failure of the Owner or Contractor to make progress payments promptly, or other contingencies <br />unforeseeable by or beyond the reasonable control of Ross Recreation. <br />5. CONTRACT, PLANS AND SPECIFICATIONS: The contract, plans and specifications are intended to supplement each other. In case of <br />conflict, however, the specifications shall control the plans, and the provisions of this contract shall control both. The Project will be constructed <br />according to the plans and specifications and any addenda, which have been signed by the parties hereto. <br />6. CHANGE ORDERS: Should the Contractor, owner, construction lender, or any public body or Inspector direct any modification or addition to <br /> <br />Ross Recreation coordinates the production and shipment of materials with the installation of those materials, if we are providing installation of <br />your equipment. Site readiness is a critical component of shipping coordination. If site readiness changes after materials are already produced, <br />payment for materials is required prior to installation. <br />The terms and conditions are expressly incorporated into this contract. Special provisions may be noted on the back. <br />PLEASE REVIEW, SIGN IMMEDIATELY <br /> <br />835 E. 14th Street <br />San Leandro, California 94577 <br />United States <br /> <br />San Leandro, City of <br />Net 30 On Materials ShipmentCredit Terms <br />$91,226.61Total <br />00016148Quote Number <br />Marina South Playground AQuote Name <br />8/30/2018Quote Date <br />2014-4878Contract Number <br /> <br />Ross Customer <br />Terms and Conditions
The URL can be used to link to this page
Your browser does not support the video tag.