Laserfiche WebLink
on in violation of this Article may be enforced as provided in Section 4-1-1130, and <br />may also be enforced by issuance of a stop work order and/or revocation of any or all <br />permits issued for such construction activity. <br />B. Construction activity shall not create dust, noise or safety hazards for adjacent residents <br />and properties. Dirt and mud shall not be tracked onto Castro Street from the project <br />site during construction. Standard construction dust control procedures, such as wetting, <br />daily roadwashing and other maintenance functions to control emissions, shall be <br />implemented at all times during outdoor construction. Dust generating activities such as <br />grading, excavation, paving, etc. shall be scheduled the early morning and other hours <br />when wind speeds are low. All construction activities entailing soil disturbance shall <br />cease when winds exceed 30 miles per hour as an hourly average. <br />C. The developer shall prepare a construction truck route plan that would restrict trucks to <br />arterial streets that have sufficient pavement section to bear the heavy truck traffic, <br />thereby minimizing noise and traffic impacts to the community. The construction truck <br />route plan shall be reviewed and approved by the City Transportation Administrator <br />prior to receipt of the grading permit. <br />D. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall be no <br />truck hauling activity on Saturdays, Sundays and Federal holidays. <br />F. Procedures with the highest noise potential shall be scheduled for daylight hours, when <br />ambient noise levels are highest. <br />F. The contractor(s) shall be required to employ the quietest among alternative equipment <br />or to muffle/control noise from available equipment. <br />G. All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) Trucks hauling <br />construction materials shall be covered with tarpaulins or other effective covers; 3) <br />Streets surrounding demolition and construction sites shall be swept at least once per <br />day; and 4) Paving and planting shall be done as soon as possible. City shall charge <br />developer, and developer shall pay, for all costs of sweeping city streets in the vicinity <br />of the project as necessary to control dust and spillage. <br />H. The property shall be secured during construction with a six (6) foot tall chain link <br />fence and any other security measures in accordance with recommendation of the San <br />Leandro Police Department. <br />Pest and vermin control shall be instituted prior to the demolition and construction of <br />the project. <br />XI. GENERAL CONDITIONS <br />A. Compliance with the City's green building programs and Build It Green's protocols. <br />B. A range of energy conservation measures, such as use of energy conserving appliances <br />and indoor and outdoor lighting, shall be incorporated into the final building plans, to <br />Agreement to Conditions October 11, 2018 <br />PLN 18-0057 Page 9 of 10 <br />