My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2018 1203
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 1203
>
8D Consent Calendar 2018 1203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2018 8:00:03 PM
Creation date
11/27/2018 8:00:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/3/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-581 <br />Budget <br />Funding for LINKS comes from the BID, grants, the City of San Leandro and advertising. The BID <br />funds approximately one-half of the LINKS service. <br />The most significant impact to the FY 2018-19 and future year budgets will be higher <br />transportation costs that are the result of negotiating a new contract and putting new vehicles into <br />service. Over the last year, the service has been significantly impacted by ongoing vehicle <br />problems associated with an aging fleet, so replacement of vehicles is critical to ensure the long <br />term success of the program. <br />The grant allocation process has also been uncertain over the last year. LINKS received a <br />$1.02M Measure BB five-year grant. The first year funding for the Measure BB grant was later <br />eliminated as a result of receiving a $204,532 Lifeline Grant. The SLTMO reapplied for the full <br />Measure BB allocation after projecting higher transportation costs. Fortunately, the BB funds <br />were reinstated as requested. The combination of the Lifeline Grant and reinstated Measure BB <br />funds have stabilized the LINKS funding for the next several years, at which time the SLTMO can <br />reapply for Measure BB funding. <br />Other factors that have impacted the program operating budget include Kaiser Permanente’s <br />decision to not extend the contract with the SLTMO to run the Kaiser Shuttle service, resulting in a <br />$60,000 revenue loss. Kaiser did not provide a reason, but it appears that they were combining <br />regional shuttle services under one contract. Marina Square continued its contract to provide <br />advertising on the LINKS buses. <br />The SLTMO continues to pursue a variety of additional grant funding opportunities. However, <br />grant funding is always a challenge and is inherently unpredictable. For example, it was not until <br />after SLTMO received the Lifeline grant that it was informed that the Measure BB grant would be <br />reduced by that amount. Grant funds are also drawn on a reimbursement basis and can only be <br />drawn as a percentage of the total expense for the reporting period. The reimbursement process <br />also creates cash flow challenges, making it necessary for the program to maintain a strong <br />reserve balance at all times. <br />The LINKS budget can be found in Exhibit C. <br />2017-18 Activities <br />In FY 2017-18, SLTMO focused on further enhancing the LINKS shuttle service through installation <br />of Nextbus technology. Nextbus provides real time arrival and departure information to riders <br />through the Nextbus mobile app. The technology also provides operational data such as <br />passenger counts and on-time performance reports. <br />Nextbus also allows riders to: <br />·Find real-time arrival predictions for nearby stops instantly <br />·Find stops and vehicles on a map <br />·Get walking directions <br />·Save favorites and set alerts for favorite stops and times <br />Page 3 City of San Leandro Printed on 11/27/2018
The URL can be used to link to this page
Your browser does not support the video tag.