My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent Calendar 2018 1203
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 1203
>
8G Consent Calendar 2018 1203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2018 8:01:01 PM
Creation date
11/27/2018 8:00:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/3/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Schedule 1 <br />Page 7 <br />EXHIBIT A-5 <br />CITY INSTALLATION GUIDELINES <br />[To be updated with each Pole License.] <br />Licensee shall install a dedicated conduit for its use; however, Licensee may use the <br />City’s existing non-traffic signal conduits, subject to the allowable conduit fill percentage under <br />the NESC and the review and approval of the City’s Public Works Department. Licensee is not <br />permitted to install or arrange for installment of external conduits on any City Poles. <br />Licensee shall apply for and install a pole-mounted Smart electrical meter, if required by <br />the City and the applicable electric utility, and obtain any necessary building permits from the <br />City for the installation and connection. Pedestal-mounted electrical meters are discouraged. <br />Licensee shall be responsible for repairing any City conduits that Licensee or its Agents <br />damage during installation of electrical facilities, including pulling of wires into street light <br />conduits. If following Licensee’s failure to make such repairs within thirty (30) days of notice from <br />City, the City’s Public Works Department makes repairs to remedy damage caused by Licensee <br />or its Agents, the City will charge Licensee the full cost of those repairs by notice with evidence <br />of the City’s costs. <br />The City will inspect Licensee’s service installations to ensure compliance with Approved <br />Plans, Specifications, and the NESC. Licensee agrees to make any repairs or modifications to its <br />service installations that are necessary to ensure compliance with the Approved Plans and <br />Specifications. <br />Licensee shall provide the City’s Engineering and Transportation Department with as-built <br />drawings showing all circuits installed by Licensee in existing street lights or conduits promptly <br />after installation is complete. Licensee shall provide a laminated copy of the as-built drawings to <br />the City’s Public Works Department. <br />Licensee shall provide the City’s Engineering and Transportation Department with the <br />final coordinates and/or digital GIS shape file for inclusion in the City’s GIS inventory. <br />Licensee shall not open any City pull boxes unless a member of the City’s Public Works <br />Department is present or City’s Engineering and Transportation Department representative <br />approves opening the pull boxes unattended by such maintenance staff. Licensee shall contact <br />the City’s Engineering and Transportation Department to complete the service connection.
The URL can be used to link to this page
Your browser does not support the video tag.