C. Construction activity shall not create dust, noise or safety hazards for adjacent residents <br />and properties. Dirt and mud shall not be tracked onto Marina Boulevard from the project <br />site during construction. Standard construction dust control procedures, such as wetting, <br />daily roadwashing and other maintenance functions to control emissions, shall be <br />implemented at all times during outdoor construction. Dust generating activities such as <br />grading, excavation, paving etc., shall be scheduled the early morning and other hours <br />when wind speeds are low. All construction activities entailing soil disturbance shall <br />cease when winds exceed 30 miles per hour as an hourly average. <br />D. The developer shall prepare a construction truck route plan that would restrict trucks to <br />arterial streets that have sufficient pavement section to bear the heavy truck traffic, <br />thereby minimizing noise and traffic impacts to the community. The construction truck <br />route plan shall be reviewed and approved by the City Transportation Administrator prior <br />to receipt of the grading permit. <br />E. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall be no <br />truck hauling activity on Saturdays, Sundays and Federal holidays. <br />F. Procedures with the highest noise potential shall be scheduled for daylight hours, when <br />ambient noise levels are highest. <br />G. The contractor(s) shall be required to employ the quietest among alternative equipment <br />or to muffle/control noise from available equipment. <br />H. All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day; 21) Trucks hauling <br />construction materials shall be covered with tarpaulins or other effective covers; 3) <br />Streets surrounding demolition and construction sites shall be swept at least once per day, <br />and 4) Paving and planting shall be done as soon as possible. City shall charge developer, <br />and developer shall pay, for all costs of sweeping city streets in the vicinity of the project <br />as necessary to control dust and spillage. <br />The property shall be secured during construction with a six (6) foot tall chain link fence <br />and any other security measures in accordance with recommendation of the San Leandro <br />Police Department. <br />XII. POLICE DEPARTMENT REQUIREMENTS <br />A. All trees planted to be mature enough and located far enough away from the sidewalk so <br />their branches are at least 8 feet above the sidewalk area and 14 feet above the roadway. <br />B. All building addresses shall be placed in such a position as to be plainly visible and <br />legible from the street. Said numbers shall contrast with their background and be visible <br />at night. Details including number size and location shall be submitted for the review and <br />approval of the City of San Leandro Police Department, Fire Marshal and the Community <br />Development Director, prior to issuance of building permits. Specific property addresses <br />will be assigned by the Building Division of the Community Development Department. <br />Agreement to Conditions October 16, 2018 <br />PLN 17-0049 Page 10 of I 1 <br />