Laserfiche WebLink
Public Highway At-Grade Crossing 03/01/13 Standard Form Approved, AVP-Law <br /> 6 <br />Section 11. EFFECTIVE DATE; TERM; TERMINATION <br /> <br />A. This Agreement is effective as of the Effective Date first herein written and shall continue in full force and effect for as long as the Roadway remains on the Railroad’s <br />property. <br /> <br />B. The Railroad, if it so elects, may terminate this Agreement effective upon <br />delivery of written notice to the Political Body in the event the Political Body does not commence construction on the portion of the Project located on the Railroad’s property <br />within twelve (12) months from the Effective Date. <br /> <br />C. If the Agreement is terminated as provided above, or for any other reason, <br />the Political Body shall pay to the Railroad all actual costs incurred by the Railroad in connection with the Project up to the date of termination, including, without limitation, all <br />actual costs incurred by the Railroad in connection with reviewing any preliminary or final <br />Project Plans. <br /> <br />Section 12. CONDITIONS TO BE MET BEFORE <br /> POLITICAL BODY CAN COMMENCE WORK <br /> <br />Neither the Political Body nor the Contractor may commence any work within the Crossing Area or on any other Railroad property until: <br />(i) The Railroad and Political Body have executed this Agreement. <br /> <br />(ii) The Railroad has provided to the Political Body the Railroad’s written approval of the Plans. <br />(iii) Each Contractor has executed Railroad’s Contractor’s Right of Entry <br />Agreement and has obtained and/or provided to the Railroad the insurance <br />policies, certificates, binders, and/or endorsements required under the <br />Contractor’s Right of Entry Agreement. <br /> (iv) Each Contractor has given the advance notice(s) required under the <br />Contractor's Right of Entry Agreement to the Railroad Representative named <br />in the Contactor's Right of Entry Agreement. <br /> <br />Section 13. FUTURE PROJECTS <br /> <br /> Future projects involving substantial maintenance, repair, reconstruction, renewal <br />and/or demolition of the Roadway shall not commence until Railroad and Political Body <br />agree on the plans for such future projects, cost allocations, right of entry terms and conditions and temporary construction rights, terms and conditions. <br /> <br />Section 14. ASSIGNMENT; SUCCESSORS AND ASSIGNS <br />