Laserfiche WebLink
Material And Force Account Estimate WESTLAKE URBAN, LLCEstimate Creation Date: 5/15/2017 Number: 111483 Version: 2 Estimate Good Until 03/11/19Location: NILES SUB, SIMN, 13.66-29.79Buy America: NoDescription of Work: SAN LEANDRO, CA, DAVIS STREET, M.P. 14.78, NILES SUBDIVISION, DOT#749728V, WO#36449, PID#100377, 100% RECOLLECTABLE (100% LOCAL)COMMENTS Description QTY UOM Unit LABOR MATERIAL TOTALCostSIGNALNO GATESXing - 1 Trk CWE w/Gates1EA116,584.0041,20075,384116,584RIO CARDXing - Track Card (Main and Stand-by) New Cable1EA12,889.006,0006,88912,889Xing - Flasher/Ped (pair)1LS57,560.0016,00041,56057,560FED IND/OVER 190.39% (SIG)Xing - Labor Additive1LS135,043.63135,0440135,044Underground Boring1LF30,000.00030,00030,000Xing - Engineering Design1LS7,729.007,72907,729Xing - Meter Service1LS20,000.00020,00020,000Sub-Total = 205,973 173,833 379,806Totals = 205,973 173,833 379,806Grand Total = $379,806Please Note: The above figures are estimates only and are subject to fluctuation. In the event of an increase or decrease in the cost or amount of material or labor required, WESTLAKE URBAN, LLC will pay actual construction costs at the current rates effective thereof. ____________________________________________________________________________________________________________________________________________________________________ Monday, June 11, 2018 Page 1 of 1