My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearing 2019 0204
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0204
>
5A Public Hearing 2019 0204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 3:43:39 PM
Creation date
1/30/2019 3:43:11 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/4/2019
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3.0 ENVIRONMENTAL CHECKLIST <br />City of San Leandro 1388 Bancroft Avenue Project <br />November 2018 Initial Study/Mitigated Negative Declaration <br />3.0-17 <br />TABLE 3.3-4 <br />CONSTRUCTION-RELATED CRITERIA POLLUTANT AND PRECURSOR EMISSIONS – UNMITIGATED <br />Construction Activities <br />Criteria Pollutant and Precursor Emissions (maximum pounds per day) a <br />ROG NOX Exhaust <br />PM10 <br />Exhaust <br />PM2.5 <br />Fugitive Dust <br />PM10 <br />Fugitive Dust <br />PM2.5 <br />2019 maximum daily emissions 1.5 15.8 0.8 0.8 3.5 1.7 <br />2020 maximum daily emissions 9.1 8.5 0.5 0.4 0.4 0.1 <br />Maximum Daily Emissions of All <br />Years of Construction 9.1 15.8 0.8 0.8 3.5 1.7 <br />BAAQMD Potentially Significant <br />Impact Threshold 54 54 82 54 <br />Basic <br />Construction <br />Mitigation <br />Measures <br />Basic <br />Construction <br />Mitigation <br />Measures <br />Exceed BAAQMD Threshold? No No No No No No <br />Source: CalEEMod version 2016.3.2. See Appendix AQ for emission model outputs. <br />Notes: a. Project construction activities are assumed to occur over a 15-month period. <br />As shown in Table 3.3-4, during construction, unmitigated short-term daily construction <br />emissions would not exceed the BAAQMD significance thresholds. Although unmitigated emissions would not exceed BAAQMD thresholds, the BAAQMD (2017a, Table 8-2) <br />recommends implementation of Basic Construction Mitigation Measures as mitigation for <br />dust and exhaust construction impacts for all projects, regardless of whether construction <br />emissions thresholds would be exceeded. Mitigation measure MM AQ-1 would require implementation of the Basic Construction Mitigation Measures, which would further reduce <br />emissions. In addition, as described in checklist item d) below, mitigation measure MM AQ-2 would require all off-road diesel-powered construction equipment to have EPA- <br />certified Tier 4 engines or have CARB-verified diesel PM exhaust filters. The use of Tier 4 engines or exhaust diesel PM filters would reduce project construction emissions of exhaust <br />PM10, and exhaust PM2.5. Predicted mitigated maximum daily construction-generated <br />emissions for the project are summarized in Table 3.3-5. <br />TABLE 3.3-5 <br />CONSTRUCTION-RELATED CRITERIA POLLUTANT AND PRECURSOR EMISSIONS – MITIGATED <br />Construction Activities <br />Criteria Pollutant and Precursor Emissions (maximum pounds per day) a <br />ROG NOX Exhaust <br />PM10 <br />Exhaust <br />PM2.5 <br />Fugitive Dust <br />PM10 <br />Fugitive Dust <br />PM2.5 <br />2019 maximum daily emissions 1.5 15.8 0.03 0.03 1.6 0.8 <br />2020 maximum daily emissions 9.1 8.5 0.03 0.03 0.4 0.1 <br />Maximum Daily Emissions of All <br />Years of Construction 9.1 15.8 0.03 0.03 1.6 0.8 <br />BAAQMD Potentially Significant <br />Impact Threshold 54 54 82 54 <br />Basic <br />Construction <br />Mitigation <br />Measures <br />Basic <br />Construction <br />Mitigation <br />Measures <br />Exceed BAAQMD Threshold? No No No No No No <br />Source: CalEEMod version 2016.3.2. See Appendix AQ for emission model outputs. <br />Notes: a. Project construction activities are assumed to occur over a 15-month period.
The URL can be used to link to this page
Your browser does not support the video tag.